{"id":798,"date":"2022-04-19T06:00:00","date_gmt":"2022-04-19T06:00:00","guid":{"rendered":"https:\/\/plaky.com\/learn\/?p=798"},"modified":"2026-02-11T07:35:32","modified_gmt":"2026-02-11T07:35:32","slug":"scrumban-project-management","status":"publish","type":"post","link":"https:\/\/plaky.com\/learn\/es\/project-management\/scrumban-project-management\/","title":{"rendered":"\u00bfQu\u00e9 es el Scrumban?"},"content":{"rendered":"\n<p class=\"translation-block\">If you\u2019re interested in Agile project management, chances are you\u2019ve heard of Scrum and Kanban. But, what about Scrumban?&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Scrumban is actually a clever amalgam of Scrum and Kanban \u2014 hence the amusing name.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">This relatively new approach to <a href=\"https:\/\/plaky.com\/learn\/project-management\/what-is-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management<\/a> combines the hard structure of Scrum with the flexibility and visual nature of Kanban.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">The result is an approach similar enough to both to easily understand and adopt \u2014 but different enough to set itself apart from other Agile frameworks.<\/p>\n\n\n\n<p class=\"translation-block\">Like the perfect cookie, Scrumban is, in the words of its ideator, Corey Ladas, <em>\u201ccrunchy on the outside, chewy on the inside.\u201d<\/em><\/p>\n\n\n\n<p class=\"translation-block\">Now that we\u2019ve got you hungry for more, let\u2019s go through our Scrumban guide to learn:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">What Scrumban is,<\/li>\n\n\n\n<li class=\"translation-block\">How it compares to Scrum and Kanban,<\/li>\n\n\n\n<li class=\"translation-block\">How to implement it,<\/li>\n\n\n\n<li class=\"translation-block\">Who it\u2019s for, and<\/li>\n\n\n\n<li class=\"translation-block\">Which advantages and disadvantages it comes with.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Let\u2019s begin!<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover.png\" alt=\"Scrumban project management - cover\" class=\"wp-image-7230\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover-300x150.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover-1024x512.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover-768x384.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Scrumban-project-management-cover-18x9.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 id=\"what-is-the-scrumban-methodology\" class=\"wp-block-heading translation-block\">What is the Scrumban methodology?<\/h2>\n\n\n\n<p class=\"translation-block\">Most people define the Scrumban framework as a combination of Scrum and Kanban. However, it might be more accurate to say that Scrumban is a lot like Kanban \u2014 but with a bit more structure and predictability.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">According to <a href=\"https:\/\/www.goodreads.com\/en\/book\/show\/25953144\" target=\"_blank\" rel=\"noreferrer noopener\"><em>The Scrumban [R]Evolution: Getting the Most Out of Agile, Scrum, and Lean Kanban<\/em><\/a><em>, <\/em>the focus of Scrumban is the application of Kanban systems in a Scrum context.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In Scrumban project management, the inherent capabilities of Scrum are improved and amplified. Layering the Kanban method alongside Scrum, though, brings some new capabilities and perspectives into the spotlight.<\/p>\n\n\n\n<p class=\"translation-block\">The result is a simple-to-use, flexible, and efficient Agile framework that can be easily implemented at any organizational level.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Still, it\u2019s important to understand the main characteristics of both Scrum and Kanban first to fully grasp Scrumban.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"686\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban.png\" alt=\"Visual representation of Scrumban combining the aspects of Scrum and Kanban\" class=\"wp-image-10212\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban-300x172.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban-1024x585.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban-768x439.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-Scrumban-combining-the-aspects-of-Scrum-and-Kanban-18x10.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Visual representation of Scrumban combining the aspects of Scrum and Kanban<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 id=\"scrum-vs-kanban-vs-scrumban\" class=\"wp-block-heading translation-block\">Scrum vs Kanban vs Scrumban<\/h2>\n\n\n\n<p class=\"translation-block\">Scrumban is a bit of a balancing act that aims to reconcile 2 opposing natures \u2013 Scrum\u2019s rigid structure and Kanban\u2019s flowy flexibility.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Understanding Scrumban entails learning more about these 2 frameworks, so here, we will:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">See how Scrum and Kanban work separately,<\/li>\n\n\n\n<li class=\"translation-block\">Find out how Scrumban combines them, and<\/li>\n\n\n\n<li class=\"translation-block\">Learn about the key ways Scrumban differs from these 2 frameworks.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"how-does-scrum-work\" class=\"wp-block-heading translation-block\">How does Scrum work?<\/h3>\n\n\n\n<p class=\"translation-block\">Scrum is the most popular lightweight framework for implementing <a href=\"https:\/\/plaky.com\/learn\/project-management\/agile-project-management\/#Agile_values_and_principles\" target=\"_blank\" rel=\"noreferrer noopener\">Agile values and principles<\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">The framework revolves around 4 different elements:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><strong>Sprint<\/strong> \u2014 a period of 2 to 4 weeks during which the Product Team focuses solely on the <a href=\"https:\/\/plaky.com\/blog\/project-task-list\/\" target=\"_blank\" rel=\"noreferrer noopener\">project tasks<\/a> listed in that particular Sprint\u2019s Backlog. Scrum restricts the amount of work per Sprint and is limited by the duration of the Sprint. This type of work system is called <a href=\"https:\/\/clockify.me\/timeboxing\" target=\"_blank\" rel=\"noreferrer noopener\">timeboxing<\/a>.<\/li>\n\n\n\n<li class=\"translation-block\"><strong><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-roles\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Team<\/a><\/strong> \u2014 a cohesive group of professionals that includes the Scrum Master, the <a href=\"https:\/\/plaky.com\/blog\/product-owner-vs-project-manager\/\" target=\"_blank\" rel=\"noreferrer noopener\">Product Owner<\/a>, and Developers,<\/li>\n\n\n\n<li class=\"translation-block\"><strong><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-artifacts\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Artifacts<\/a><\/strong> \u2014 information nuggets and tools that represent value or work in the Scrum framework and include the <a href=\"https:\/\/plaky.com\/blog\/product-backlog\/\" target=\"_blank\" rel=\"noreferrer noopener\">Product Backlog<\/a>, Product Goal, Sprint Backlog, Sprint Goal, Increment, and Definition of Done, and<\/li>\n\n\n\n<li class=\"translation-block\"><strong><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-events\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Events<\/a> <\/strong>\u2014 formal events for inspecting and adapting Sprint Artifacts that include Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">According to the <a href=\"https:\/\/scrumguides.org\/scrum-guide.html\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Guide<\/a>, each of these elements has a specific purpose and plays a valuable role in project realization.<\/p>\n\n\n\n<p class=\"translation-block\">An expert we reached out to, <a rel=\"noreferrer noopener\" href=\"https:\/\/www.linkedin.com\/in\/erinjoannathames\/\" target=\"_blank\">Erin Joanna Thames<\/a>, an efficiency and start-up consultant and the PMP-certified founder of A Climate of Change LLC, gave us an on-point description of Scrum and what it entails:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cThink of Scrum as the highly-specialized rule follower. Scrum has a pretty rigid set of instructions, roles, and prescribes how to plan, act, review, and so on. Every person on a Scrum team knows their role, what is expected of them, and most importantly, they understand the process of Scrum and the cyclical approach of the project methodology.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"686\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process.png\" alt=\"The process of a Sprint in Scrum\" class=\"wp-image-10214\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process-300x172.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process-1024x585.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process-768x439.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/The-Scrum-process-18x10.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">The process of a Sprint in Scrum<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"translation-block\">Each Sprint typically includes the following steps:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Sprint planning and the creation of the Sprint Backlog,<\/li>\n\n\n\n<li class=\"translation-block\">Implementation\/Execution (including Daily Scrum meetings and <a href=\"https:\/\/plaky.com\/learn\/project-management\/backlog-refinement\/\" target=\"_blank\" rel=\"noreferrer noopener\">backlog refinement<\/a>),<\/li>\n\n\n\n<li class=\"translation-block\">Sprint Review, and<\/li>\n\n\n\n<li class=\"translation-block\">Sprint Retrospective.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Scrum doesn\u2019t inherently require a visual aid, but the Scrum Team can use a <a rel=\"noreferrer noopener\" href=\"https:\/\/www.forbes.com\/advisor\/business\/what-is-a-scrum-board\/\" target=\"_blank\">Scrum Board<\/a> to better organize their work. The simplest type consists of only 3 columns (To do, In progress, and Done), but the team can add as many columns (or rather, categories) as necessary.<\/p>\n\n\n\n<p class=\"translation-block\">Since Scrum is a popular framework, many project management tools even offer a <a href=\"https:\/\/plaky.com\/templates\/scrum-board\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Board template<\/a> you can customize to your liking.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"529\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1.png\" alt=\"Example of a Scrum board in Plaky\" class=\"wp-image-5631\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-300x132.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-1024x451.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-768x339.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-18x8.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Example of a Scrum board in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block\">\ud83d\udca1 <strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block\">If you\u2019re interested in delving deeper into the Scrum processes and terminology, you\u2019ll find this guide on Scrum project management helpful:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum in Project Management: An Overview<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"how-does-kanban-work\" class=\"wp-block-heading translation-block\">How does Kanban work?<\/h3>\n\n\n\n<p class=\"translation-block\">Kanban is another method for implementing Agile principles, with a bit of <a href=\"https:\/\/plaky.com\/learn\/project-management\/lean-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lean project management<\/a> thrown into the mix.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">The <a href=\"https:\/\/www.goodreads.com\/book\/show\/34525224-agile-practice-guide\" target=\"_blank\" rel=\"noreferrer noopener\"><em>Agile Practice Guide<\/em><\/a><em> <\/em>states that Kanban is the <em>\u201coriginal start-where-you-are method\u201d<\/em>.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">This essentially means it is rather easy to incorporate since it doesn\u2019t require a particular setup or changing an organization\u2019s existing processes.<\/p>\n\n\n\n<p class=\"translation-block\">The core properties of Kanban are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Visualize the workflow,<\/li>\n\n\n\n<li class=\"translation-block\">Limit work in progress (WIP),<\/li>\n\n\n\n<li class=\"translation-block\">Focus and manage the flow,<\/li>\n\n\n\n<li class=\"translation-block\">Ensure process policies are explicit,<\/li>\n\n\n\n<li class=\"translation-block\">Implement feedback loops, and<\/li>\n\n\n\n<li class=\"translation-block\">Improve collaboratively.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">According to Erin Joanna Thames, Kanban seems like a solid choice for Agile project management novices:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cKanban [&#8230;] has more relaxed rules, no specific roles, and you can kind of work in a continuous flow instead of the Sprints required in Scrum. It&#8217;s great for beginners who are just starting to grasp Agile project management and how to move tasks throughout a process.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1186\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min.png\" alt=\"Kanban process\" class=\"wp-image-10215\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min-300x297.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min-1024x1012.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min-768x759.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/kanban-process-min-12x12.png 12w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">How Kanban works<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"translation-block\">Kanban is famous for its visual aspect \u2014 the Kanban board. These boards can be physical or digital and usually consist of the following elements:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Visual signals,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Columns,<\/li>\n\n\n\n<li class=\"translation-block\">WIP limits,<\/li>\n\n\n\n<li class=\"translation-block\">Commitment point, and<\/li>\n\n\n\n<li class=\"translation-block\">Delivery point.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Similar to a Scrum board, the most basic Kanban board includes 3 columns:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">To do,<\/li>\n\n\n\n<li class=\"translation-block\">In progress, and<\/li>\n\n\n\n<li class=\"translation-block\">Done.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"653\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1.png\" alt=\"Example of a Kanban board in Plaky\" class=\"wp-image-5633\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1-300x163.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1-1024x557.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1-768x418.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Kanban-board-in-Plaky-1-18x10.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Example of a Kanban board in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block\">\ud83d\udca1 <strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block\">The guide below offers a detailed overview of Kanban for those looking to expand their knowledge and understanding of this popular project management approach.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/learn\/project-management\/kanban-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">What Is Kanban Project Management?<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"how-does-scrumban-combine-scrum-and-kanban\" class=\"wp-block-heading translation-block\">How does Scrumban combine Scrum and Kanban?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block\">In <a href=\"https:\/\/www.goodreads.com\/book\/show\/6117571-scrumban\" target=\"_blank\" rel=\"noreferrer noopener\"><em>Scrumban: Essays on Kanban Systems for Lean Software Development<\/em><\/a>, Corey Ladas mentions how a large part of the Scrum community has overcommitted to a <em>\u201cnarrow, prescriptive, and rigid\u201d <\/em>process.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">This is something that Jeff Sutherland, one of the creators of Scrum, would also call \u201c<em>Type A Scrum<\/em>\u201d, as mentioned in his paper on the <a href=\"https:\/\/www.scruminc.com\/wp-content\/uploads\/2014\/05\/Parallel-Pipelining-of-Sprints-in-Complex-Projects.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">future of Scrum<\/a>.<\/p>\n\n\n\n<p class=\"translation-block\">To break away from Scrum\u2019s restrictive nature, Ladas suggests it\u2019s possible to<em> \u201cincrementally enhance Scrum with more and more pull-like features until all that remains of the original process is vestigial scaffolding.\u201d<\/em><\/p>\n\n\n\n<p class=\"translation-block\">According to a paper on the <a href=\"https:\/\/www.ijitee.org\/wp-content\/uploads\/papers\/v9i4\/D1566029420.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">integration of Scrumban in software engineering<\/a>, Scrumban combines:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><strong>Scrum\u2019s agility of empiricism <\/strong>\u2014 Scrum theory is partially based on empiricism and the idea of learning from experience and reaching decisions based on observations, and<\/li>\n\n\n\n<li class=\"translation-block\"><strong>Kanban\u2019s transparent workflow management system<\/strong> \u2014 the use of Kanban boards in <a href=\"https:\/\/plaky.com\/workflow-management\" target=\"_blank\" rel=\"noreferrer noopener\">workflow management software<\/a> enables a higher degree of visualization (and thus, transparency) in the project team.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Generally speaking, some of the <strong>Scrum elements<\/strong> Scrumban may include are:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li class=\"translation-block\">Regular iteration planning cycles that consider work complexity,<\/li>\n\n\n\n<li class=\"translation-block\">Iteration reviews and retrospectives,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">On-demand prioritization,<\/li>\n\n\n\n<li class=\"translation-block\">Definition of \u201cReady\u201d, and<\/li>\n\n\n\n<li class=\"translation-block\">The use of the \u201cReady\u201d queue for further organization.<\/li>\n<\/ol>\n\n\n\n<p class=\"translation-block\">The <strong>Kanban principles and ideas<\/strong> we can use in Scrumban include:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li class=\"translation-block\">WIP limits,<\/li>\n\n\n\n<li class=\"translation-block\">Visual representation of a continuous <a href=\"https:\/\/plaky.com\/blog\/project-management-workflow\/\" target=\"_blank\" rel=\"noreferrer noopener\">project workflow<\/a> without timeboxing,<\/li>\n\n\n\n<li class=\"translation-block\">Pull system,<\/li>\n\n\n\n<li class=\"translation-block\">Just-in-time analysis and planning to accommodate shorter lead times,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/learn\/project-management\/project-roles\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project team role<\/a> flexibility,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Buffer columns,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Kanban metrics (cycle and lead time, throughput, and Service Level Expectation),&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Explicit process policies (internal guidelines), and<\/li>\n\n\n\n<li class=\"translation-block\">Continuous improvement philosophy (<a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-methodologies\/#PM_methodology_5_Kaizen\" target=\"_blank\" rel=\"noreferrer noopener\">Kaizen<\/a>).<\/li>\n<\/ol>\n\n\n\n<h4 id=\"which-elements-can-you-include-in-scrumban\" class=\"wp-block-heading translation-block\">Which elements can you include in Scrumban?<\/h4>\n\n\n\n<p class=\"translation-block\">In his book <a href=\"https:\/\/www.goodreads.com\/book\/show\/60496765-what-is-scrumban\" target=\"_blank\" rel=\"noreferrer noopener\"><em>What is Scrumban?<\/em><\/a>, Andrew Stellman highlights that there isn\u2019t a precise guide to Scrumban or a certified authority that prescribes which elements give a framework the Scrumban name.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">So, since there\u2019s no Scrumban manifesto of sorts, there may be some variations across teams trying to combine Scrum and Kanban. Each team may come up with their own blend that works for their needs and projects.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Erin Joanna Thames also believes the key to combining PM methodologies lies in the project team itself:&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cScrumban, as a hybrid methodology, in theory can combine Scrum and Kanban in a number of different ways. The key in combining methodologies is to ensure that the team still has an agreed upon understanding about which aspects of Scrum and Kanban are being deployed and what <\/em><a rel=\"noreferrer noopener\" href=\"https:\/\/plaky.com\/blog\/kpi-project-management\/\" target=\"_blank\"><em>KPIs<\/em><\/a><em> are being tracked.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<h3 id=\"how-does-scrumban-differ-from-scrum-and-kanban\" class=\"wp-block-heading translation-block\">How does Scrumban differ from Scrum and Kanban?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block\">Scrumban may be a nice blend of Scrum and Kanban, but that doesn\u2019t mean it\u2019s just a copy of some of their best features.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Arguably the main difference between Scrum and Scrumban is that the former relies heavily on Sprints \u2014 while the latter may or may not use them.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">As mentioned in an empirical study on the <a href=\"https:\/\/www.researchgate.net\/profile\/Mashal-Alqudah\/publication\/329506016_An_Empirical_Study_of_Scrumban_Formation_based_on_the_Selection_of_Scrum_and_Kanban_Practices\/links\/5c1d6b4792851c22a33d3570\/An-Empirical-Study-of-Scrumban-Formation-based-on-the-Selection-of-Scrum-and-Kanban-Practices.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">formation of Scrumban<\/a> based on Scrum and Kanban practices, Scrumban teams can decide for themselves which practices to adopt.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In general, Scrumban teams can do Sprints if they want. However, most of the time, they stick to short (often 2-week-long) iterations. Tasks in Scrumban can be long-running and span several iterations too.<\/p>\n\n\n\n<p class=\"translation-block\">More relaxed iterations are also Erin Joanna Thames\u2019s favorite aspect of Scrumban:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cI think a lot of people believe that Scrumban is just Scrum with a lot of the rules and structure removed, and that is simply not true. What I like most about the hybrid approach provided through Scrumban is that I can still use some cycle iterations, but they don&#8217;t have to be as strict, and there is not as much of a negative cascading effect if deadlines are missed.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block\">Scrumban usually nixes story points too, which help Scrum teams decide what they\u2019ll work on in an upcoming Sprint. Instead, Scrumban teams decide what tasks to do next based on priority.<\/p>\n\n\n\n<p class=\"translation-block\">As for Kanban, one of the major ways it differs from Scrumban is the project board.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">A Kanban board often has just 3 columns (To do, In progress, and Done). Because Scrumban also includes some Scrum features, such as the Definition of Ready, a Scrumban board is usually more extensive. The board can consist of various other columns that break down the project workflow further.&nbsp;<\/p>\n\n\n\n<h4 id=\"scrum-vs-kanban-vs-scrumban-comparison\" class=\"wp-block-heading translation-block\">Scrum vs Kanban vs Scrumban comparison&nbsp;<\/h4>\n\n\n\n<p class=\"translation-block\">Here\u2019s a detailed comparison chart of these 3 methods to help you learn more about their similarities and differences.<\/p>\n\n\n\n<figure class=\"wp-block-table responsive\"><table><thead><tr><th class=\"has-text-align-left\" data-align=\"left\"><strong>Criteria<\/strong><\/th><th class=\"has-text-align-left\" data-align=\"left\"><strong>Scrum<\/strong><\/th><th class=\"has-text-align-left\" data-align=\"left\"><strong>Kanban<\/strong><\/th><th class=\"has-text-align-left\" data-align=\"left\"><strong>Scrumban<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Rules<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Strict&nbsp;<\/td><td class=\"has-text-align-left\" data-align=\"left\">Flexible<\/td><td class=\"has-text-align-left\" data-align=\"left\">Moderate&nbsp;<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Teams<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Cross-functional teams<\/td><td class=\"has-text-align-left\" data-align=\"left\">Cross-functional or specialized<\/td><td class=\"has-text-align-left\" data-align=\"left\">Cross-functional or specialized<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Team roles<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Specified and strict roles (Scrum Master, Product Owner, and Developers)<\/td><td class=\"has-text-align-left\" data-align=\"left\">Service Delivery Manager and Service Request Manager (but usually no specific work roles or titles)<\/td><td class=\"has-text-align-left\" data-align=\"left\">Undefined (teams can also keep their Scrum roles)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Iterations&nbsp;<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Timeboxed Sprints lasting a month or less<\/td><td class=\"has-text-align-left\" data-align=\"left\">Continuous flow<\/td><td class=\"has-text-align-left\" data-align=\"left\">Continuous flow with short (usually 2-week-long) iterations<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Ease of adoption<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Somewhat challenging transition due to the rules and specific structure<\/td><td class=\"has-text-align-left\" data-align=\"left\">Easy transition from more structured methods<\/td><td class=\"has-text-align-left\" data-align=\"left\">Moderate depending on the level of knowledge of both Scrum and Kanban<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Scope limits<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">The amount of work is limited to a particular Sprint<\/td><td class=\"has-text-align-left\" data-align=\"left\">WIP task limits<\/td><td class=\"has-text-align-left\" data-align=\"left\">WIP and To-Do task limits<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Task estimation<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Task estimation happens before each Sprint<\/td><td class=\"has-text-align-left\" data-align=\"left\">No need for task estimation<\/td><td class=\"has-text-align-left\" data-align=\"left\">No need for task estimation<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Task prioritization&nbsp;<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tasks are prioritized before each Sprint<\/td><td class=\"has-text-align-left\" data-align=\"left\">Daily prioritization based on the pull principle and just-in-time planning<\/td><td class=\"has-text-align-left\" data-align=\"left\">Task prioritization usually happens during planning<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Task size<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Limited to what can be achieved during a Sprint<\/td><td class=\"has-text-align-left\" data-align=\"left\">Any size<\/td><td class=\"has-text-align-left\" data-align=\"left\">Any size<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Assigning tasks<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Tasks are assigned to specific team members during Backlog Refinement or Sprint Planning<\/td><td class=\"has-text-align-left\" data-align=\"left\">Pull system (team members choose what they want to work on)<\/td><td class=\"has-text-align-left\" data-align=\"left\">Pull system (team members choose what they want to work on)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Task timespan<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Limited to the Sprint\u2019s duration<\/td><td class=\"has-text-align-left\" data-align=\"left\">No timespan limits<\/td><td class=\"has-text-align-left\" data-align=\"left\">No timespan limits<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Key performance metrics<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Sprint burndown charts, team velocity<\/td><td class=\"has-text-align-left\" data-align=\"left\">Throughput, cumulative flow diagram, lead and cycle time<\/td><td class=\"has-text-align-left\" data-align=\"left\">Average lead and cycle time<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Meetings and other ceremonies and events<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Sprint Planning meetings, Daily Scrum, Sprint Review, and Sprint Retrospective<\/td><td class=\"has-text-align-left\" data-align=\"left\">Does not require meetings<\/td><td class=\"has-text-align-left\" data-align=\"left\">Daily meetings and occasional Kaizen events are encouraged, other meetings are optional and usually held on an ad-hoc basis<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Adding new tasks or making changes during an iteration<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Forbidden&nbsp;<\/td><td class=\"has-text-align-left\" data-align=\"left\">Allowed when appropriate<\/td><td class=\"has-text-align-left\" data-align=\"left\">Allowed when appropriate&nbsp;<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Planning methods<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\">Sprint planning<\/td><td class=\"has-text-align-left\" data-align=\"left\">Release and demand planning<\/td><td class=\"has-text-align-left\" data-align=\"left\">Bucket-size planning, on-demand\/trigger planning<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 id=\"how-to-implement-scrumban\" class=\"wp-block-heading translation-block\">How to implement Scrumban<\/h2>\n\n\n\n<p class=\"translation-block\">As mentioned, there are hardly any rules or best practices to follow when implementing Scrumban. The process largely depends on the parts of Scrum and Kanban you decide to use \u2014 so the steps may look slightly different for every team.<\/p>\n\n\n\n<p class=\"translation-block\">Generally speaking, Scrumban has 4 <a href=\"https:\/\/plaky.com\/learn\/project-management\/phases-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project phases<\/a>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Initiation,<\/li>\n\n\n\n<li class=\"translation-block\">Planning,<\/li>\n\n\n\n<li class=\"translation-block\">Execution, and<\/li>\n\n\n\n<li class=\"translation-block\">Delivery and feedback.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">We\u2019ve come up with 5 key steps you should strive to follow when implementing Scrumban:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li class=\"translation-block\">Flesh out the project and the Product Backlog,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Plan the Iteration Backlog,<\/li>\n\n\n\n<li class=\"translation-block\">Build the Scrumban board,<\/li>\n\n\n\n<li class=\"translation-block\">Set up WIP limits and the planning trigger, and<\/li>\n\n\n\n<li class=\"translation-block\">Continuously pull items and refine your workflow.<\/li>\n<\/ol>\n\n\n\n<p class=\"translation-block\">Let\u2019s go through each in more detail.<\/p>\n\n\n\n<h3 id=\"step-1-flesh-out-the-project-and-the-product-backlog\" class=\"wp-block-heading translation-block\">Step #1: Flesh out the project and the Product Backlog<\/h3>\n\n\n\n<p class=\"translation-block\">First things first \u2014 you start the whole Scrumban process by assessing and fleshing out the project at hand.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">You get input for the project from key <a href=\"https:\/\/plaky.com\/learn\/project-management\/stakeholder-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project stakeholders<\/a>, the executive team, users and customers. The main idea here is to find out what the project should achieve and gather all the information you can get about the <a href=\"https:\/\/plaky.com\/blog\/requirements-gathering-techniques\/#What_are_requirements_in_project_management\" target=\"_blank\" rel=\"noreferrer noopener\">project requirements<\/a>.<\/p>\n\n\n\n<p class=\"translation-block\">Essentially, this is when you:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Map out the project,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Nail down the fundamentals, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Gather user stories.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Once you have that, start building the Product Backlog. This is an extensive list of items that need to be completed to create the final product. Even in its basic form, the items in the Product Backlog are prioritized in some way.<\/p>\n\n\n\n<p class=\"translation-block\">You also get to build your project team now. As mentioned, predefining roles isn\u2019t a requirement, though you can keep Scrum Roles if you\u2019re switching from Scrum to Scrumban.<\/p>\n\n\n\n<p class=\"translation-block\">While you\u2019re here, decide on the Scrumban elements you want to use. For instance, daily meetings are greatly encouraged, but you can decide on the format.<\/p>\n\n\n\n<p class=\"translation-block\">In Scrum daily meetings, you focus on the people and what they\u2019ve been doing. A Kanban-style daily meeting, however, might be more appropriate in Scrumban. Such a meeting focuses on the tasks and usually takes only about 15 minutes.<\/p>\n\n\n\n<p class=\"translation-block\">You can also schedule Kaizen events to discuss work process improvement and resolving issues. This type of event is optional (like most <a href=\"https:\/\/plaky.com\/blog\/agile-meetings\/\" target=\"_blank\" rel=\"noreferrer noopener\">Agile meetings<\/a> in Scrumban), but it can be a great learning opportunity for the team.<\/p>\n\n\n\n<p class=\"translation-block\">Retrospective meetings are also mostly optional, but again beneficial \u2014 you can hold them every 2 weeks or so, or at the end of the iteration.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Since there aren\u2019t any strict rules in Scrumban, you can have impromptu retrospectives too whenever necessary.<\/p>\n\n\n\n<p class=\"translation-block\">\n<div class=\"banner banner-dark plaky-gradient-default\">\n    <div class=\"banner-text lg:pr-[6rem]\">\n        <h2 class=\"translation-block text-2xl !mb-4\">Free project management software<\/h2>\n        <p class=\"translation-block !text-sm\">Lead and direct complex projects with ease. Collaborate, optimize, adapt \u2014 with Plaky.<\/p>\n\n        <div class=\"banner-buttons d-flex space-x-4 translation-block\">\n            <a class=\"rounded-md px-6 py-2 bg-white\" href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\">Sign up<\/a>\n\n                            <a class=\"button-2\" href=\"https:\/\/plaky.com\" target=\"_blank\">Learn more<\/a>\n                    <\/div>\n    <\/div>\n\n    <div class=\"banner-image banner-image-right \">\n        <picture>\n            <source srcset=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/default@2x.png 2x\" alt=\"Illustration\"  media=\"(min-width: 1022px)\" \/>\n            <img decoding=\"async\" src=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/default.png\"  alt=\"Illustration\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n    <\/p>\n\n\n\n<h3 id=\"step-2-plan-the-iteration-workflow\" class=\"wp-block-heading translation-block\">Step #2: Plan the iteration workflow<\/h3>\n\n\n\n<p class=\"translation-block\">The next step involves figuring out:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">The iteration interval, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">What goes in the Iteration Backlog.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">In Scrum, you work with the <a href=\"https:\/\/plaky.com\/blog\/sprint-backlog-vs-product-backlog\/\" target=\"_blank\" rel=\"noreferrer noopener\">Product Backlog and Sprint Backlog<\/a>. In Scrumban, the equivalent to the Sprint Backlog is called an Iteration Backlog.<\/p>\n\n\n\n<p class=\"translation-block\">The Iteration Backlog is a list of top-priority items pulled from the Product Backlog that the team is set to complete during an iteration interval. Most often, it takes the form of the \u201cTo do\u201d column on the Scrumban board.<\/p>\n\n\n\n<p class=\"translation-block\">Similar to a Sprint in Scrum (minus the rigid structure), an iteration interval determines how long a team will work on a single set of items from the Iteration Backlog. The length of iterations in Scrumban depends on the industry and type of project \u2014 but they are usually kept short and rarely last longer than 2 weeks.<\/p>\n\n\n\n<p class=\"translation-block\">At this point, you can make an iteration schedule and hold a planning meeting for the upcoming iteration. Usually, it\u2019s not necessary to plan the tasks for each iteration. Instead, tasks can be added to the Iteration Backlog based on priority.<\/p>\n\n\n\n<p class=\"translation-block\">The items in the Iteration Backlog are themselves prioritized, and each task thus listed should be performed in the order of priority. Besides limiting work in progress, Scrumban also limits the number of priority items in the Iteration Backlog.<\/p>\n\n\n\n<p class=\"translation-block\">The Iteration Backlog limit is determined by dividing the number of days in the iteration interval by the average cycle time.<\/p>\n\n\n\n<p class=\"translation-block\">As a simple example, if there are 10 cards in progress, and it takes 10 days on average to complete them all, the average cycle time is 1 day. If we take that the length of the interval is 2 weeks, or 10 working days, the Iteration Backlog limit is 10.<\/p>\n\n\n\n<h3 id=\"step-3-build-the-scrumban-board\" class=\"wp-block-heading translation-block\">Step #3: Build the Scrumban board<\/h3>\n\n\n\n<p class=\"translation-block\">Next up, it\u2019s time to visualize the workload in a Scrumban board.<\/p>\n\n\n\n<p class=\"translation-block\">The first column in the board should be the \u201cTo do\u201d column or \u201cBacklog\u201d. After that, you can add a \u201cReady\u201d column.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In Kanban and Scrumban boards, the \u201cReady\u201d column contains several items from the Iteration Backlog that must be finished first. In that case, the team disregards the Iteration Backlog and always prioritizes working on the items from the \u201cReady\u201d column.<\/p>\n\n\n\n<p class=\"translation-block\">The \u201cReady\u201d column can be followed by an extensive Work-in-Progress section.<\/p>\n\n\n\n<p class=\"translation-block\">The WIP section of the board contains all the cards that are currently being worked on. Ideally, this section comprises multiple columns, each corresponding to a step in the given task. It should be exhaustive and make it easy for the team to follow the progress of each individual card and spot pending issues.<\/p>\n\n\n\n<p class=\"translation-block\">A Scrumban board can also contain multiple buffer columns that regulate the movement of cards on the board.<\/p>\n\n\n\n<p class=\"translation-block\">A buffer column is any column on the board that doesn\u2019t add value to the project. None of the cards parked in buffer columns have a team member assigned to them.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Since each column has a certain WIP limit, to start working on another card, a team member has to make room in the active column.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">They can do so by moving the card that they have completed into a mini \u201cDone\u201d pile, where it will wait until it\u2019s picked up by another team.<\/p>\n\n\n\n<h3 id=\"step-4-set-wip-limits-and-the-planning-trigger\" class=\"wp-block-heading translation-block\">Step #4: Set WIP limits and the planning trigger<\/h3>\n\n\n\n<p class=\"translation-block\">Once you have populated the backlog and set up the Scrumban board, the next step is to set WIP limits and the planning trigger.<\/p>\n\n\n\n<p class=\"translation-block\">WIP limits are a distinctive characteristic of both Kanban and Scrumban. They are fixed constraints that prevent the team from pulling new work before finishing previously started tasks.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">The purpose of WIP limits is to increase the team\u2019s focus by ensuring they concentrate on and complete a smaller set of tasks. In practice, this essentially means setting a limit for the number of cards that each of the WIP columns can contain.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"732\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits.png\" alt=\"Visual representation of WIP limits\" class=\"wp-image-3128\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits-300x183.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits-1024x625.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits-768x468.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-WIP-limits-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Visual representation of WIP limits<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"translation-block\">We\u2019ve already mentioned that you can limit the number of items found in the Iteration Backlog. Another limit you could introduce is the <strong>order point<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Scrumban is known for relying on trigger planning \u2014 a type of planning that\u2019s not scheduled in advance but held as needed.<\/p>\n\n\n\n<p class=\"translation-block\">The framework may lack real Sprints, but it still has planning cycles. To determine when to hold planning meetings, Corey Ladas introduced the concept of the \u201corder point\u201d.<\/p>\n\n\n\n<p class=\"translation-block\">The order point is a limit that triggers a planning session. Once the number of items in the \u201cTo do\u201d column drops below the order point, it triggers an alarm that notifies the responsible parties that it\u2019s time to add more items to the list.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"505\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point.png\" alt=\"Visual representation of the order point\" class=\"wp-image-3126\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point-300x126.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point-1024x431.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point-768x323.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/visual-representation-of-the-order-point-18x8.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Visual representation of the order point<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"step-5-continuously-pull-items-and-refine-workflow\" class=\"wp-block-heading translation-block\">Step #5: Continuously pull items and refine workflow<\/h3>\n\n\n\n<p class=\"translation-block\">Throughout the Scrumban process, the team continually pulls items from the Iteration Backlog. To further refine their workflow, the team also keeps track of Scrumban metrics for future projects, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><strong>Cycle time<\/strong> \u2014 how many days a work item is kept \u201cin progress\u201d,<\/li>\n\n\n\n<li class=\"translation-block\"><strong>Throughput <\/strong>\u2014 how many work items the team has finished in a set period, and<\/li>\n\n\n\n<li class=\"translation-block\"><strong>Service Level Expectation<\/strong> \u2014 the historical cycle time of the Scrumban team.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Each iteration usually ends with a client review and release, during which you gather feedback and possibly even new requirements for the rest of the project. After that, the team goes back to the Product Backlog to continue working on the project.<\/p>\n\n\n\n<p class=\"translation-block\">Controlling the <a href=\"https:\/\/plaky.com\/learn\/project-management\/scope-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project scope<\/a> is essential throughout the iteration, so as it comes to a close, you can implement <strong>feature freeze<\/strong> and <strong>triage<\/strong>.<\/p>\n\n\n\n<p class=\"translation-block\">Feature freeze is a reaction to a fast-approaching <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-deadline\/\" target=\"_blank\" rel=\"noreferrer noopener\">project deadline<\/a>. Once a feature freeze is declared, no additional features can be added to the product. The team must continue working only on the features that have already been scheduled.<\/p>\n\n\n\n<p class=\"translation-block\">The <a href=\"https:\/\/plaky.com\/learn\/project-management\/what-project-managers-do\/\" target=\"_blank\" rel=\"noreferrer noopener\">project manager<\/a> can also implement triage. If the team realizes that they won\u2019t manage to develop all the scheduled features by the deadline, a triage process is performed to prioritize the scheduled features. The features deemed to be of higher priority will be developed, while the rest will be dropped.<\/p>\n\n\n\n<p class=\"translation-block\">The final step in this stage \u2014 albeit optional \u2014 is to hold a retrospective meeting. This kind of meeting would especially benefit new Scrumban teams that are still getting used to the framework.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">It gives them a chance to reflect on their processes and seek ways to improve them. At the very least, it provides a nice closure for each iteration.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1821\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process.png\" alt=\"Visual representation of the Scrumban process\" class=\"wp-image-10216\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process-198x300.png 198w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process-675x1024.png 675w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process-768x1165.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process-1012x1536.png 1012w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Visual-representation-of-the-Scrumban-process-8x12.png 8w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Visual representation of the Scrumban process<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 id=\"who-is-scrumban-for\" class=\"wp-block-heading translation-block\">Who is Scrumban for?<\/h2>\n\n\n\n<p class=\"translation-block\">We\u2019ve gone over the differences between Scrum and Kanban and how they combine to create Scrumban as a middle ground. Yet you might still be wondering when to use Scrumban \u2014 and whether it\u2019s the right approach for your team.<\/p>\n\n\n\n<p class=\"translation-block\">If that\u2019s the case, we have the answer.<\/p>\n\n\n\n<p class=\"translation-block\">In general, Scrumban is a great solution for teams looking for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">More structure in Kanban project management, or<\/li>\n\n\n\n<li class=\"translation-block\">More flexibility in Scrum project management.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">A common belief is that Scrumban emerged as a helpful framework for teams transitioning from Scrum to Kanban.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">But as Andrew Stellman mentions in his book, that makes little sense because the 2 methods don\u2019t have the same goal. Scrum deals with project management and successful product delivery, whereas Kanban is all about continuous process improvement.<\/p>\n\n\n\n<p class=\"translation-block\">Still, you can use Scrumban when:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">The project team needs more flexibility and freedom in how it works (e.g., when choosing tasks),&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">It\u2019s necessary to ruthlessly prioritize and limit work in progress to ensure focus and actual task completion, and<\/li>\n\n\n\n<li class=\"translation-block\">There\u2019s a need to maintain ongoing projects, i.e., those without a definitive date of completion.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"how-popular-is-scrumban\" class=\"wp-block-heading translation-block\">How popular is Scrumban?<\/h3>\n\n\n\n<p class=\"translation-block\">The <a href=\"https:\/\/info.digital.ai\/rs\/981-LQX-968\/images\/AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">16th State of Agile Report<\/a> by Digital.ai shows Scrum and Kanban are as popular as ever, with 87% of Agile teams using Scrum while 56% are leveraging Kanban.<\/p>\n\n\n\n<p class=\"translation-block\">Unsurprisingly, their benefits \u2014 and faults \u2014 have given Scrumban a chance to stand out too. The survey marked its growth in popularity at 27%.<\/p>\n\n\n\n<p class=\"translation-block\">Interestingly enough, Scrumban focuses more on improving the workflow rather than achieving a set <a href=\"https:\/\/plaky.com\/blog\/smart-goals-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project goal<\/a>, so it\u2019s often used by disciplines like HR, sales, and marketing.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In fact, according to the <a href=\"https:\/\/www.agilebusiness.org\/resource\/blog-annual-state-of-agile-marketing-report-2022.html\" target=\"_blank\" rel=\"noreferrer noopener\">2022 Annual State of Marketing Report<\/a> by AgileSherpas, a whopping 61% of marketing departments follow a <a href=\"https:\/\/plaky.com\/learn\/project-management\/hybrid-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">hybrid project management methodology<\/a> or Scrumban.<\/p>\n\n\n\n<p class=\"translation-block\">Here\u2019s how a marketing department could use <a rel=\"noreferrer noopener\" href=\"https:\/\/plaky.com\/task-management\" target=\"_blank\">task management software<\/a> like Plaky to create a Scrumban social media calendar board:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"794\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1.png\" alt=\"Example of a Scrumban social media calendar board in Plaky\" class=\"wp-image-5634\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1-300x199.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1-1024x678.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1-768x508.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrumban-social-media-calendar-board-in-Plaky-1-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Example of a Scrumban social media calendar board in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"translation-block\">If you\u2019re still unsure whether you should use it, the following list of Scrumban\u2019s pros and cons might help you make up your mind.<\/p>\n\n\n\n<h2 id=\"scrumban-advantages\" class=\"wp-block-heading translation-block\">Scrumban advantages&nbsp;&nbsp;<\/h2>\n\n\n\n<p class=\"translation-block\">Scrumban inevitably becomes a more appealing option when just using Scrum or Kanban isn\u2019t working out. Some of the key benefits we want to focus on here, though, are that Scrumban:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Allows for effortless implementation,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Saves time,<\/li>\n\n\n\n<li class=\"translation-block\">Makes it easy to spot bottlenecks,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Enables long-term planning,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Facilitates greater focus to bring better-quality results,<\/li>\n\n\n\n<li class=\"translation-block\">Handles large projects with ease, and<\/li>\n\n\n\n<li class=\"translation-block\">Keeps everyone in the loop.&nbsp;&nbsp;&nbsp;<\/li>\n<\/ul>\n\n\n\n<h3 id=\"advantage-1-scrumban-allows-for-effortless-implementation\" class=\"wp-block-heading translation-block\">Advantage #1: Scrumban allows for effortless implementation<\/h3>\n\n\n\n<p class=\"translation-block\">Scrumban inherited a large portion of its identity from Kanban. Thus, it should be no surprise that it\u2019s equally easy to adopt.<\/p>\n\n\n\n<p class=\"translation-block\">Much like Kanban, Scrumban doesn\u2019t have many hard and fast rules, allowing for an easier implementation.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">You can also implement it gradually. This would allow your team to get up to speed with the Scrumban way of work on their own without much pressure.<\/p>\n\n\n\n<p class=\"translation-block\">The expert we talked to, Erin Joanna Thames, described how she uses Scrumban when working with clients:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cI use some combination of Scrumban when working with all my clients, and I define which methodology we are using based on my client\u2019s level of understanding.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block\">She shared with us a real-world example of what this process looks like:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"644\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png\" alt=\"Erin Joanna Thames\" class=\"wp-image-3118\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames.png 644w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Erin-Joanna-Thames-12x12.png 12w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block\"><em>\u201cCurrently, I am supporting a tech startup and the owner\/founder has a limited understanding of project management methodologies. So, we started their first initiative with a simple Kanban flow. They now understand the ideology behind Kanban and what we are measuring, tracking, and how we limit the work in progress. The goal is to get the team to a collective hybrid approach. The team knows the goal, what aspects of Scrum we will layer onto our current methodology, and how to get there. If we had started with a Scrumban approach, the founder would have been lost, and we would have not gotten any work done.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block\">Scrumban is also rather easy to implement because it doesn\u2019t require any change in existing roles within the project team. Scrumban forgoes Scrum&#8217;s idea of predetermined roles, and it doesn\u2019t pre-assign the tasks.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Instead, Scrumban teams are largely flexible and self-managing \u2014 they pull tasks from the Iteration Backlog on their own and work autonomously toward the end goal.<\/p>\n\n\n\n<h3 id=\"advantage-2-scrumban-saves-time\" class=\"wp-block-heading translation-block\">Advantage #2: Scrumban saves time<\/h3>\n\n\n\n<p class=\"translation-block\">Due to its tendency to strive toward Lean, Scrumban allows for work and planning to be done in a minimalistic fashion \u2014 only when necessary and for no longer than necessary.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In the grand scheme of things, setting an order point for trigger planning essentially allows Scrumban teams to shave off a lot of time from planning sessions, estimations, and resolving bottlenecks. Apart from saving time, this also encourages better results and efficiency since the team then has more time to focus properly on the actual tasks.&nbsp;<\/p>\n\n\n\n<h3 id=\"advantage-3-scrumban-makes-it-easy-to-spot-bottlenecks\" class=\"wp-block-heading translation-block\">Advantage #3: Scrumban makes it easy to spot bottlenecks<\/h3>\n\n\n\n<p class=\"translation-block\">Bottlenecks are a major issue if left unattended, as they can easily slow down or prevent progress throughout the project. Luckily, the visual aspect of Scrumban allows teams to spot any potential or ongoing problems on the board in time and immediately take action.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Not all issues can be resolved that easily \u2014 just because you\u2019re using Scrumban doesn\u2019t mean extensive roadblocks won\u2019t ever jeopardize the project.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Proper <a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-management-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">risk management<\/a> would still help immensely to ensure project success. This aspect of Scrumban, though, certainly saves a lot of time in identifying issues and allows more time for effective troubleshooting.&nbsp;<\/p>\n\n\n\n<h3 id=\"advantage-4-scrumban-enables-long-term-planning\" class=\"wp-block-heading translation-block\">Advantage #4: Scrumban enables long-term planning&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block\">Though Scrumban nurtures on-demand planning, it\u2019s also partial to enabling long-term planning.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">When using this framework, teams can rely on bucket-size planning to further classify the Product Backlog according to priority.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">This technique entails visualizing 3 buckets of time. Usually, they\u2019re called a:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">1-year bucket,<\/li>\n\n\n\n<li class=\"translation-block\">6-month bucket, and<\/li>\n\n\n\n<li class=\"translation-block\">3-month bucket.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">The 1-year bucket contains long-term goals. They sit in the 1-year bucket until the team thinks it\u2019s time to start fleshing them out.<\/p>\n\n\n\n<p class=\"translation-block\">They are then moved to the 6-month bucket where the goals are defined in more detail.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Once it\u2019s almost time to start working on them, these goals are transferred to the 3-month bucket. There, they are further divided into manageable tasks that can eventually be transferred to the board as items in the Iteration Backlog.&nbsp;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1106\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban.png\" alt=\"Bucket-size planning in Scrumban\" class=\"wp-image-10217\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban-300x277.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban-1024x944.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban-768x708.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2022\/04\/Bucket-size-planning-in-Scrumban-13x12.png 13w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Bucket-size planning in Scrumban<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"advantage-5-scrumban-facilitates-greater-focus-to-bring-better-quality-results\" class=\"wp-block-heading translation-block\">Advantage #5: Scrumban facilitates greater focus to bring better-quality results<\/h3>\n\n\n\n<p class=\"translation-block\">Scrumban\u2019s WIP limits force each team member to work on one item at a time and finish it before moving on to the next one. However, the benefit of this is even greater if we consider how bad multitasking often is.<\/p>\n\n\n\n<p class=\"translation-block\">The idea behind WIP limits is to prevent juggling multiple tasks at a time. Instead, it encourages the team to focus on each task and give it as much attention as it deserves \u2014 without any distractions.<\/p>\n\n\n\n<p class=\"translation-block\">Because of trigger planning, the backlog doesn\u2019t get updated as often, forcing team members to work on fewer tasks with more focus. Thanks to WIP limits, multitasking is kept to a minimum too, as team members cannot hoard tasks.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Given the <a href=\"https:\/\/pmc.ncbi.nlm.nih.gov\/articles\/PMC7075496\/\" target=\"_blank\" rel=\"noreferrer noopener\">detrimental effects of task switching<\/a> \u2014 e.g., reduced accuracy and speed \u2014 a lack of multitasking actually contributes to greater focus and better-quality results in Scrumban.<\/p>\n\n\n\n<p class=\"translation-block\">A key part of all this is the pull system. The pull system allows cards to move into the next column only when there\u2019s an available spot in that column.<\/p>\n\n\n\n<p class=\"translation-block\">Queues in front of stores during the pandemic might be an adequate analogy for this. If only 5 people are allowed in the store and 5 people are already inside, the next person that wants to enter can do so only when someone leaves the store.<\/p>\n\n\n\n<p class=\"translation-block\">This system is made possible by:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">The WIP limits, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">The flexible nature of Scrumban teams, which allows team members to choose the cards they will work on as the need arises.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"advantage-6-scrumban-handles-large-projects-with-ease\" class=\"wp-block-heading translation-block\">Advantage #6: Scrumban handles large projects with ease<\/h3>\n\n\n\n<p class=\"translation-block\">The visual nature of Scrumban and its iterative approach to project management allow Scrumban teams to manage gargantuan projects with relative ease and in a much more organized fashion.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Moreover, Scrumban can accommodate a large number of team members, and a Scrumban board can have as many columns and cards as necessary.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">Scrumban borrows another feature from Kanban to enhance the workflow further, especially in larger projects and teams \u2014 swimlanes.<\/p>\n\n\n\n<p class=\"translation-block\">Swimlanes are horizontal lines that separate the board into sections to classify work items into different groups. So, you can have separate swimlanes for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Different departments, teams, and clients,<\/li>\n\n\n\n<li class=\"translation-block\">Types of services,<\/li>\n\n\n\n<li class=\"translation-block\">Urgent tasks,<\/li>\n\n\n\n<li class=\"translation-block\">Repetitive tasks,<\/li>\n\n\n\n<li class=\"translation-block\">Project steps or phases, etc.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">Swimlanes help enhance <a href=\"https:\/\/plaky.com\/blog\/workload-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">workload management<\/a> and organization. Essentially, they provide a much better insight into the tasks based on certain criteria.<\/p>\n\n\n\n<p class=\"translation-block\">Combined with typical columns on a Kanban board, they create a grid that makes it easier to visualize the life cycle of tasks and track their progress.<\/p>\n\n\n\n<p class=\"translation-block\">Swimlanes are especially useful in large teams where the sheer number of tasks can get overwhelming. In these cases, swimlanes help:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Make sense of the board,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Find the exact card you\u2019re looking for, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Spot issues fast.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1075\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky.png\" alt=\"Example of swimlanes in Plaky\" class=\"wp-image-3122\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky-300x269.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky-1024x917.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky-768x688.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/example-of-swimlanes-in-Plaky-13x12.png 13w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Example of swimlanes in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"advantage-7-scrumban-keeps-everyone-in-the-loop\" class=\"wp-block-heading translation-block\">Advantage #7: Scrumban keeps everyone in the loop<\/h3>\n\n\n\n<p class=\"translation-block\">Having a clean visual representation of the team\u2019s progress is paramount for successful project management since it fosters transparency and helps keep everyone on the same page.<\/p>\n\n\n\n<p class=\"translation-block\">This is especially important when managing remote teams.<\/p>\n\n\n\n<p class=\"translation-block\">The use of Scrumban in remote teams was tested in an empirical study on <a href=\"https:\/\/www.scitepress.org\/Papers\/2016\/56864\/56864.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Scrumban\u2019s impact on geographically distributed software development<\/a>. The aim of the study was to learn how Scrumban would influence the performance of 2 software development teams from Italy and Finland.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">The researchers claimed that <em>\u201cgeographically distributed teams with poorly planned coordination often end up with unmatched deadlines, costs overrun, and even canceled projects\u201d.&nbsp;<\/em><\/p>\n\n\n\n<p class=\"translation-block\">However, they found that using Scrumban helped alleviate some of the major challenges of remote teams, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Team synchronization,<\/li>\n\n\n\n<li class=\"translation-block\">Culture,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Communication, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Leveraging resources.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block\">They further listed a more frequent use of synchronous communication and functional knowledge-sharing infrastructure as crucial in coordinating remote teams.<\/p>\n\n\n\n<p class=\"translation-block\">To achieve this, you need sophisticated project management tools like Plaky, which allow for fast correspondence and quick and safe <a href=\"https:\/\/plaky.com\/features\/files\" target=\"_blank\" rel=\"noreferrer noopener\">file-sharing capabilities<\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1247\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky.png\" alt=\"File sharing in Plaky\" class=\"wp-image-5275\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky-289x300.png 289w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky-985x1024.png 985w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky-768x798.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2024\/02\/How-file-sharing-works-in-Plaky-12x12.png 12w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">File sharing in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block\">\ud83d\udca1 <strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block\">Learn why communication matters so much in project management and how to improve it in the guide below:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/blog\/communication-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Why Is Communication Important in Project Management?<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"scrumban-disadvantages\" class=\"wp-block-heading translation-block\">Scrumban disadvantages<\/h2>\n\n\n\n<p class=\"translation-block\">Scrumban seems to have taken the best of both worlds and created a superb combo by merging Agile and Lean into an effective framework.<\/p>\n\n\n\n<p class=\"translation-block\">But, as nothing in this world is perfect, neither is Scrumban. Some of its most prominent disadvantages are that it:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Can get out of control,<\/li>\n\n\n\n<li class=\"translation-block\">Makes it difficult to determine individual efforts, and<\/li>\n\n\n\n<li class=\"translation-block\">Reduces the project manager\u2019s role.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"disadvantage-1-scrumban-can-get-out-of-control\" class=\"wp-block-heading translation-block\">Disadvantage #1: Scrumban can get out of control<\/h3>\n\n\n\n<p class=\"translation-block\">Since it\u2019s a relatively new approach to project management defined as a hybrid between Scrum and Kanban, people can sometimes see it as open to interpretation.<\/p>\n\n\n\n<p class=\"translation-block\">Scrumban is not a rigid framework by any means. Like Kanban, it doesn\u2019t have a predefined set of best practices to follow.<\/p>\n\n\n\n<p class=\"translation-block\">However, Scrumban doesn\u2019t entail picking and choosing arbitrary elements of Scrum and Kanban and mushing them together, let alone inventing new ones.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">As Andrew Stellman puts it, \u201c<em>for a Scrumban implementation to have integrity, it must preserve the empirical process control of Scrum while at the same time implementing a Kanban pull system.\u201d<\/em><\/p>\n\n\n\n<p class=\"translation-block\">The general lack of understanding of Scrumban can lead to confused teams following something they think is Scrumban, but is actually a slightly modified version of Scrum. Worse, it may even be something that doesn\u2019t fit any of the 3 frameworks mentioned above.<\/p>\n\n\n\n<h3 id=\"disadvantage-2-scrumban-makes-it-difficult-to-determine-individual-efforts\" class=\"wp-block-heading translation-block\">Disadvantage #2: Scrumban makes it difficult to determine individual efforts<\/h3>\n\n\n\n<p class=\"translation-block\">Scrumban gives each team member more independence by letting them choose the exact tasks they want to work on. However, the team\u2019s autonomy can lead to lots of confusion when determining each individual\u2019s efforts.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">In a Scrumban system, cards are flying across the board and dozens of team members are working on them at any given time. This makes it nearly impossible to keep track of who is doing what \u2014 and evaluate their efforts.<\/p>\n\n\n\n<p class=\"translation-block\">Besides that, meetings are scarce, and pre-assigning cards is a no-go. In the long term, this makes keeping track of the progress of individual members even more difficult.<\/p>\n\n\n\n<h3 id=\"disadvantage-3-scrumban-reduces-the-project-managers-role\" class=\"wp-block-heading translation-block\">Disadvantage #3: Scrumban reduces the project manager\u2019s role<\/h3>\n\n\n\n<p class=\"translation-block\">Finally, note that Scrumban doesn\u2019t put much emphasis on project managers, their <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-skills\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management skills<\/a>, or their ability to control their teams.<\/p>\n\n\n\n<p class=\"translation-block\">Scrumban doesn\u2019t prescribe any specific roles, so there isn\u2019t an exact hierarchy to keep track of in such a system. What\u2019s more, each team member can choose the tasks they feel like doing and that they specialize in.<\/p>\n\n\n\n<p class=\"translation-block\">This kind of autonomy doesn\u2019t go well with a control-obsessed project manager. A project manager who wants to use Scrumban has to accept the fact that their influence on the team will be diminished.<\/p>\n\n\n\n<p class=\"translation-block\">Granted, the project manager has control over long-term <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-plan-templates\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management plans<\/a>. However, once the tasks become available to be worked on, their role is drastically reduced \u2014 they don\u2019t have to be hands-on at all.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">\n<div class=\"banner banner-dark plaky-gradient-features\">\n    <div class=\"banner-text lg:pr-[6rem]\">\n        <h2 class=\"translation-block text-2xl !mb-4\">Free project management software<\/h2>\n        <p class=\"translation-block !text-sm\">Let the projects manage themselves. Try Plaky.<\/p>\n\n        <div class=\"banner-buttons d-flex space-x-4 translation-block\">\n            <a class=\"rounded-md px-6 py-2 bg-white\" href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\">Sign up<\/a>\n\n                            <a class=\"button-2\" href=\"https:\/\/plaky.com\" target=\"_blank\">Learn more<\/a>\n                    <\/div>\n    <\/div>\n\n    <div class=\"banner-image banner-image-middle \">\n        <picture>\n            <source srcset=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/features@2x.png 2x\" alt=\"Illustration\"  media=\"(min-width: 1022px)\" \/>\n            <img decoding=\"async\" src=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/features.png\"  alt=\"Illustration\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n    <\/p>\n\n\n\n<h2 id=\"conclusion-scrumban-combines-the-best-of-scrum-and-kanban\" class=\"wp-block-heading translation-block\">Conclusion: Scrumban combines the best of Scrum and Kanban<\/h2>\n\n\n\n<p class=\"translation-block\">Some of the most appealing features of Scrumban include a lack of rigid rules and a team hierarchy. The framework essentially gives the project team more freedom to do great work and choose the tasks according to their specialization.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block\">At its core, Scrumban is the middle ground between 2 rather popular Agile project management approaches. However, since there are no prescribed practices or exact methods for combining Scrum and Kanban \u2014 each team\u2019s version is likely to be unique in its own way.<\/p>\n\n\n\n<p class=\"custom-btn translation-block\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n\n\n\n<p class=\"has-background translation-block\" style=\"background-color:#e5f6fe\">\ud83d\udcd6 You find Scrumban useful, but would like to expand your knowledge on project management? Check out our <a href=\"https:\/\/plaky.com\/learn\/glossary\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project Management Glossary of Terms<\/a> to get familiar with project management terminology.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scrumban es un marco h\u00edbrido que implica la aplicaci\u00f3n de los principios Kanban en un contexto Scrum para una gesti\u00f3n de proyectos m\u00e1s flexible y eficiente.<\/p>","protected":false},"author":37,"featured_media":7231,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[18,4],"tags":[],"class_list":["post-798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management-methodologies","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/comments?post=798"}],"version-history":[{"count":44,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/798\/revisions"}],"predecessor-version":[{"id":11635,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/798\/revisions\/11635"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/media\/7231"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/media?parent=798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/categories?post=798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/tags?post=798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}