{"id":4988,"date":"2023-12-27T15:25:07","date_gmt":"2023-12-27T15:25:07","guid":{"rendered":"https:\/\/plaky.com\/learn\/?p=4988"},"modified":"2026-04-15T09:52:17","modified_gmt":"2026-04-15T09:52:17","slug":"scrum-events","status":"publish","type":"post","link":"https:\/\/plaky.com\/learn\/es\/project-management\/scrum-events\/","title":{"rendered":"Los eventos de Scrum: Todo lo que necesitas saber"},"content":{"rendered":"\n<p class=\"translation-block wp-block-paragraph\">If you\u2019re planning to implement the <a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum framework<\/a> within your organization, you\u2019ll need to start organizing the special Scrum meetings known as Scrum Events (or ceremonies).<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">As explained in <a href=\"https:\/\/scrumguides.org\/docs\/scrumguide\/v2020\/2020-Scrum-Guide-US.pdf#zoom=100\" target=\"_blank\" rel=\"noreferrer noopener\"><em>The Scrum Guide<\/em><\/a>, each Scrum event is a formal opportunity to inspect and adapt the 3 <a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-artifacts\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Artifacts<\/a> (the Sprint and Product Backlog and the Increments).&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">There are 5 Scrum events in total, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">The Sprint,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Sprint Planning,<\/li>\n\n\n\n<li class=\"translation-block\">Daily Scrum,<\/li>\n\n\n\n<li class=\"translation-block\">Sprint Review, and<\/li>\n\n\n\n<li class=\"translation-block\">Sprint Retrospective.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Optimally, you should hold each event at the same specified time and place to reduce complexity and create regularity.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Now, let\u2019s dive further into the specifics of each Scrum event.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1000\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover.png\" alt=\"The Scrum Events- All You Should Know cover\" class=\"wp-image-4984\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover-300x250.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover-1024x853.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover-768x640.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Scrum-Events-All-You-Should-Know-cover-14x12.png 14w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<ul class=\"wp-block-list key-takeaways\">\n<li class=\"translation-block\">The 5 Scrum events include the Sprint, Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective.<\/li>\n\n\n\n<li class=\"translation-block\">Scrum events are also called the Scrum ceremonies.<\/li>\n\n\n\n<li class=\"translation-block\">The main Scrum event is the Sprint, and it contains the other 4 Scrum events.<\/li>\n\n\n\n<li class=\"translation-block\">Scrum events provide an opportunity for inspection and adaptation of the Scrum Artifacts.<\/li>\n\n\n\n<li class=\"translation-block\">All Scrum events should remain positive, productive, and within the timebox.<\/li>\n<\/ul>\n\n\n\n<h2 id=\"event-1-the-sprint\" class=\"wp-block-heading translation-block\">Event #1: The Sprint<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint itself is an event in Scrum \u2014 In fact, it is the main event that contains all other Scrum events.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint is a fixed period of time during which the <a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-roles\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Team<\/a> works on creating a valuable Increment.<\/p>\n\n\n\n<h3 id=\"what-happens-during-the-sprint\" class=\"wp-block-heading translation-block\">What happens during the Sprint?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Within the Sprint, the Scrum Team tracks progress toward the Product Goal and refines the <a href=\"https:\/\/plaky.com\/blog\/product-backlog\/\" target=\"_blank\" rel=\"noreferrer noopener\">Product Backlog<\/a> as needed.<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Each Sprint may be seen as a short project. The main objective of Sprints is to create Increments on a regular basis. So, when one Sprint ends, the next one begins, until the team finally arrives at the desired product \u2014 the final <a href=\"https:\/\/plaky.com\/learn\/project-management\/deliverable-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project deliverable<\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">If the Sprint Goal becomes obsolete, it\u2019s the <a href=\"https:\/\/plaky.com\/blog\/product-owner-vs-project-manager\/\" target=\"_blank\" rel=\"noreferrer noopener\">Product Owner<\/a> who has the authority to cancel the Sprint.<\/p>\n\n\n\n<h3 id=\"how-long-does-the-sprint-last\" class=\"wp-block-heading translation-block\">How long does the Sprint Last?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Sprints typically last between 1 week and 1 month, depending on the timeframe agreed upon by the team.&nbsp;<\/p>\n\n\n\n<h3 id=\"expert-tips-for-the-sprint\" class=\"wp-block-heading translation-block\">Expert tips for the Sprint&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Our contributor, <a href=\"https:\/\/www.linkedin.com\/in\/sergeydmitriev\/\" target=\"_blank\" rel=\"noreferrer noopener\">Serg Dmitriev<\/a>, a Certified Scrum Trainer, Business Therapist, and the Founder and CEO of Unusual Concepts Agile, advises that the Sprint should be kept as short as possible:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png\" alt=\"Serg Dmitriev\" class=\"wp-image-4983\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png 500w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-12x12.png 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cIn general, you want your Sprints to be shorter \u2014 3 weeks are better than 4, 2 better than 3, and 1 is better than 2. This is because the shorter the Sprint, the shorter the feedback loop. If you make something wrong and show it to your customer after 2 weeks, you will have twice as much to redo than if your Sprints are 1-week long. A shorter time to market is also preferred because bringing your product faster to market will give you money sooner \u2014 the money that you otherwise lose forever.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">According to <a href=\"https:\/\/www.linkedin.com\/in\/vzanini\/\" target=\"_blank\" rel=\"noreferrer noopener\">Valerio Zanini (CST, CPIT)<\/a>, a Certified Scrum Master and Trainer, before you start the Sprint, you should align on 2 things with your team:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"669\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg\" alt=\"Valerio Zanini\" class=\"wp-image-4987\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg 669w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--12x12.jpg 12w\" sizes=\"auto, (max-width: 669px) 100vw, 669px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cBefore you start any work, make sure to spend a bit of time with your team and align on:<\/em><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><em>Working agreement: what rules do we want to have for ourselves to be successful in this project and to enjoy working together?<\/em><\/li>\n\n\n\n<li class=\"translation-block\"><em>Definition of Done: when we do the work, how do we know when the work is completed? What are some key standards of quality that we need to satisfy?\u201d<\/em><\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"700\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint.png\" alt=\"The Sprint\" class=\"wp-image-4986\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint-300x175.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint-1024x597.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint-768x448.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/The-Sprint-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">The Sprint<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-background translation-block wp-block-paragraph\" style=\"background-color:#e5f6fe\">\ud83d\udcd6 Sprint is the best-known Scrum term, but if you want to check out others not covered in this article, hop to our <a href=\"https:\/\/plaky.com\/learn\/glossary\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project Management Glossary of Terms<\/a>.<\/p>\n\n\n\n<h2 id=\"event-2-sprint-planning\" class=\"wp-block-heading translation-block\">Event #2: Sprint Planning<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Sprint Planning is a Scrum event that serves to establish what can be delivered within a Sprint and how to accomplish this.&nbsp;<\/p>\n\n\n\n<h3 id=\"what-happens-during-the-sprint-planning\" class=\"wp-block-heading translation-block\">What happens during the Sprint Planning?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">During this event, the Product Owner and Developers discuss which items from the Product Backlog will be included in the Sprint.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">After having defined the Sprint Backlog and the Sprint Goals, Developers initiate the Sprint. Then, they plan the work necessary to create an Increment that meets the Definition of Done.<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block wp-block-paragraph\"><strong>\ud83d\udca1 Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">To learn more about the differences between Product and Sprint Backlogs, take a look at the following blog post:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/blog\/sprint-backlog-vs-product-backlog\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sprint Backlog vs. Product Backlog: 7 Key Differences<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"how-long-does-the-sprint-planning-last\" class=\"wp-block-heading translation-block\">How long does the Sprint Planning last?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The length of the Sprint Planning event depends on the length of the Sprint.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">However, as explained in <em>The Scrum Guide<\/em>, this event shouldn\u2019t last longer than 8 hours for a 1-month Sprint. For shorter Sprints, the event is usually shorter.<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">\n<div class=\"banner banner-dark plaky-gradient-landing-4\">\n    <div class=\"banner-text lg:pr-[6rem]\">\n        <h2 class=\"translation-block text-2xl !mb-4\">Free project management software<\/h2>\n        <p class=\"translation-block !text-sm\">Plan and organize your Sprints with a simple, user-friendly tool \u2014 Plaky.<\/p>\n\n        <div class=\"banner-buttons d-flex space-x-4 translation-block\">\n            <a class=\"rounded-md px-6 py-2 bg-white\" href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\">Sign up<\/a>\n\n                            <a class=\"button-2\" href=\"https:\/\/plaky.com\" target=\"_blank\">Learn more<\/a>\n                    <\/div>\n    <\/div>\n\n    <div class=\"banner-image banner-image-bottom \">\n        <picture>\n            <source srcset=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/landing-4@2x.png 2x\" alt=\"Illustration\"  media=\"(min-width: 1022px)\" \/>\n            <img decoding=\"async\" src=\"https:\/\/plaky.com\/learn\/wp-content\/themes\/cake-learn\/src\/images\/plaky\/banners\/landing-4.png\"  alt=\"Illustration\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n    <\/p>\n\n\n\n<h3 id=\"expert-tips-for-the-sprint-planning\" class=\"wp-block-heading translation-block\">Expert tips for the Sprint Planning<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">According to Dmitriev, it\u2019s good to invite 2 specific groups of people to the Sprint Planning event:&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png\" alt=\"Serg Dmitriev\" class=\"wp-image-4983\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png 500w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-12x12.png 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cI highly recommend inviting external people to your Sprint Planning sessions. This is often an overlooked but valuable practice. Specifically, 2 groups of people: subject matter experts \u2014 people who can advise the team on technical implementation details or share deep domain knowledge with the team. The second group is the end users \u2014 people who will get the end results of our work. We can ask them how they want the things to be working before we actually implement them.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">In addition, Zanini advises measuring how much work the team can commit to completing:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"669\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg\" alt=\"Valerio Zanini\" class=\"wp-image-4987\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg 669w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--12x12.jpg 12w\" sizes=\"auto, (max-width: 669px) 100vw, 669px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cAt the beginning of Sprint Planning, start the conversation about the available capacity. Make sure this is at or below your average velocity. By doing this, you will set up a Sprint commitment that you know is reasonably achievable without overcommitting.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block wp-block-paragraph\">\ud83d\udca1<strong> Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Planning your sprints is easier with the right Scrum tool. Find reviews of the top Scrum tools in the following article:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/blog\/best-scrum-tools\/\" target=\"_blank\" rel=\"noreferrer noopener\">Top 12 Scrum Tools: Tested and Reviewed (2025)<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"event-3-daily-scrum\" class=\"wp-block-heading translation-block\">Event #3: Daily Scrum<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Daily Scrum is a short Scrum event Developers use to review and adjust the progress toward the Sprint Goal.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">They meet once a day at the so-called Daily Scrum meeting.<\/p>\n\n\n\n<h3 id=\"what-happens-during-the-daily-scrum\" class=\"wp-block-heading translation-block\">What happens during the Daily Scrum?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The purpose of the Daily Scrum is to review the progress toward the Sprint Goal.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Daily Scrums have several benefits, including:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Improving communication,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Identifying obstacles,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Promoting quick decision-making, and<\/li>\n\n\n\n<li class=\"translation-block\">Reducing the need for other meetings.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">According to <a href=\"https:\/\/www.linkedin.com\/in\/jaredrhill\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jared Hill, PMP<\/a>, Senior Technical Project Manager and a PMO Consultant, daily stand-up meetings, or Daily Scrums, greatly contribute to accountability in Scrum:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill.jpg\" alt=\"Jared Hill\" class=\"wp-image-4982\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill.jpg 800w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill-300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill-150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill-768x768.jpg 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Jared-Hill-12x12.jpg 12w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cDaily stand-ups provide an opportunity for the Development team, Product Owners, and the Scrum Master to create awareness of where each work item is on the journey to &#8220;done&#8221;. The frequent check-ins reduce the risk of work items &#8220;falling through the cracks&#8221; and raise awareness of any and all blockers. There&#8217;s a lot of impact coming out of that 15-minute meeting when done correctly.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<h3 id=\"how-long-does-the-daily-scrum-last\" class=\"wp-block-heading translation-block\">How long does the Daily Scrum last?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Daily Scrum typically lasts around 15 minutes.&nbsp;<\/p>\n\n\n\n<h3 id=\"expert-tips-for-the-daily-scrum\" class=\"wp-block-heading translation-block\">Expert tips for the Daily Scrum<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Our contributor, Serg Dmitriev, emphasizes that the Daily Scrum should be a place to talk rather than to report:&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png\" alt=\"Serg Dmitriev\" class=\"wp-image-4983\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png 500w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-12x12.png 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cMake sure your Daily Scrum is not an exercise in micromanagement. It\u2019s not the place where team members are reporting to management, but rather a place where they are sharing important information with each other. The easiest way to achieve this is to let only the team members attend this meeting (no managers, not even the Scrum Master).\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Valerio Zanini further explains the key to a successful Daily Scrum:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"669\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg\" alt=\"Valerio Zanini\" class=\"wp-image-4987\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg 669w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--12x12.jpg 12w\" sizes=\"auto, (max-width: 669px) 100vw, 669px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cThe key to a successful Daily Scrum is to understand its purpose. The goal of Daily Scrum is to align on the progress of the Sprint (where are we with the work we have committed to doing in this Sprint?) and on what we are going to do next (what tasks are we going to complete today?).\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 id=\"event-4-sprint-review\" class=\"wp-block-heading translation-block\">Event #4: Sprint Review<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint review is a session where the Scrum Team members reviews what has been accomplished during the Sprint and prepares for the next one.<\/p>\n\n\n\n<h3 id=\"what-happens-during-the-sprint-review\" class=\"wp-block-heading translation-block\">What happens during the Sprint Review?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">In the Sprint Review, the Scrum Team presents the results of the Sprint to key <a href=\"https:\/\/plaky.com\/learn\/project-management\/stakeholder-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">stakeholders<\/a>, and together, they inspect those results and determine what needs to be adapted in the future.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint Review is focused on product-related improvements, and it shouldn\u2019t be just a presentation. Rather, it should be a working session where the attendees discuss their next steps and possible adjustments to the Product Backlog.&nbsp;<\/p>\n\n\n\n<h3 id=\"how-long-does-the-sprint-review-last\" class=\"wp-block-heading translation-block\">How long does the Sprint Review last?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">According to <em>The Scrum Guide<\/em>, the Sprint Review is a timeboxed event limited to a maximum of 4 hours for a 1-month Sprint. For shorter Sprints, this event is usually shorter.<\/p>\n\n\n\n<h3 id=\"expert-tips-for-the-sprint-review\" class=\"wp-block-heading translation-block\">Expert tips for the Sprint Review<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">According to Serg Dmitriev, as with the Sprint Review, the Sprint Planning should also include external people:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png\" alt=\"Serg Dmitriev\" class=\"wp-image-4983\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png 500w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-12x12.png 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cToo often I observe the anti-pattern when the team shows their work to management and management only. Please invite a few randomly picked end users of your product. Ask them to use what you\u2019ve built and ask them to provide real feedback. I hope you agree that what our real users think (they pay their money for our product after all) is more important than what our management thinks about our work.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Zanini also highlights the importance of including stakeholders and customers in your Sprint Review:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"669\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg\" alt=\"Valerio Zanini\" class=\"wp-image-4987\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg 669w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--12x12.jpg 12w\" sizes=\"auto, (max-width: 669px) 100vw, 669px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201c[The Sprint Review] should be more than just a \u201cdemo\u201d. As a starting point, demo what you have achieved in this Sprint. Then get feedback from your stakeholders and customers: what do they like about it? What could be improved? What shall we focus on next?<\/em><\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\"><em>The Product Owner should also present an updated Roadmap or Release Plan (if you have one), and share the Burn-up Chart: this will create alignment with stakeholders and customers about progress and expectations, and set the conditions for conversation about changes to the plan, if needed.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 id=\"event-5-sprint-retrospective\" class=\"wp-block-heading translation-block\">Event #5: Sprint Retrospective<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint Retrospective is the final Scrum event where the Scrum Team discusses the Sprint and identifies what should change to improve effectiveness for the next Sprint.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint Retrospective focuses on the tools and processes used rather than the product itself.<\/p>\n\n\n\n<h3 id=\"what-happens-during-the-sprint-retrospective\" class=\"wp-block-heading translation-block\">What happens during the Sprint Retrospective?<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">During this event, the Scrum Team reviews the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">What went well during the Sprint,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">What problems were faced, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">How those problems were (or were not) resolved.<\/li>\n<\/ul>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Some of the specifics that the Scrum Team inspects include how the entire process went concerning:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Individuals,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Interactions,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Processes,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Tools, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">The Definition of Done.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h3 id=\"how-long-does-the-sprint-retrospective-last\" class=\"wp-block-heading translation-block\">How long does the Sprint Retrospective last?&nbsp;<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">The Sprint Retrospective lasts 3 hours maximum for a 1-month Sprint. For shorter Sprints, the event is usually shorter.<\/p>\n\n\n\n<h3 id=\"expert-tips-for-the-sprint-retrospective\" class=\"wp-block-heading translation-block\">Expert tips for the Sprint Retrospective<\/h3>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Dmitriev strongly emphasizes that the Sprint Retrospective should be kept productive:&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png\" alt=\"Serg Dmitriev\" class=\"wp-image-4983\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev.png 500w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-300x300.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-150x150.png 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Serg-Dmitriev-12x12.png 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"translation-block wp-block-paragraph\"><em>\u201cPlease avoid the anti-pattern of \u2018Groundhog Day retrospectives\u2019. I use this term to describe the retrospective after which nothing changes and the team discusses the same things over and over again, week after week, Sprint after Sprint.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Zanini highlights that the Sprint Retrospective can be a powerful event that helps the team improve, sharing a few suggestions regarding this event:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"669\" height=\"669\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg\" alt=\"Valerio Zanini\" class=\"wp-image-4987\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini-.jpg 669w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--300x300.jpg 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--150x150.jpg 150w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/12\/Valerio-Zanini--12x12.jpg 12w\" sizes=\"auto, (max-width: 669px) 100vw, 669px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><em>\u201cChange the exercise or the list of questions every Sprint. Don\u2019t run the same retrospective over and over.<\/em><\/li>\n\n\n\n<li class=\"translation-block\"><em>Focus the Retrospective on something specific, rather than \u201cthis last Sprint\u201d. For example, do a retrospective on how the team is implementing the 5 <a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-values\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Values<\/a>. Or do a retrospective on the communication between the Product Owner, Developers, and stakeholders.\u201d<\/em><\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"translation-block wp-block-paragraph\">\ud83d\udca1<strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Did you know that Scrum events are sometimes referred to as Agile events or meetings? Check out the following blog post to learn some tips on how to manage them:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\"><a href=\"https:\/\/plaky.com\/blog\/agile-meetings\/\" target=\"_blank\" rel=\"noreferrer noopener\">Agile Meetings: What They Are and Tips on Managing Them<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"inspect-and-adapt-your-scrum-process-with-plaky\" class=\"wp-block-heading translation-block\">Inspect and adapt your Scrum process with Plaky<\/h2>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">Scrum events serve as an opportunity to inspect and adapt the Scrum Artifacts and are created to provoke change and increase transparency within the Scrum process.&nbsp;<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">However, to achieve these goals, it\u2019s highly advised that all Scrum events remain:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"translation-block\">Positive,&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Productive, and&nbsp;<\/li>\n\n\n\n<li class=\"translation-block\">Within the timebox.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"529\" src=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1.png\" alt=\"Example of a Scrum board in Plaky\" class=\"wp-image-5631\" srcset=\"https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1.png 1200w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-300x132.png 300w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-1024x451.png 1024w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-768x339.png 768w, https:\/\/plaky.com\/learn\/wp-content\/uploads\/2023\/05\/Example-of-a-Scrum-board-in-Plaky-1-18x8.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Example of a Scrum board in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"translation-block wp-block-paragraph\">The Plaky project management tool can help you achieve the transparency of Scrum events and the entire Scrum process.<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\">You can use Plaky\u2019s <a href=\"https:\/\/plaky.com\/templates\/scrum-board\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum Board Template<\/a> and track the Scrum process the way it suits your specific needs, in the table or Kanban view. This way you\u2019ll easily track your Sprint\u2019s progress, and keep up with the planned dates.<\/p>\n\n\n\n<p class=\"translation-block wp-block-paragraph\"><em>Manage your Sprints more transparently and remain responsive to change. Sign up for Plaky now!<\/em><\/p>\n\n\n\n<p class=\"custom-btn translation-block wp-block-paragraph\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Los eventos o ceremonias de Scrum son reuniones especiales de Scrum que brindan una oportunidad para la inspecci\u00f3n y adaptaci\u00f3n de los artefactos de Scrum.<\/p>","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,33],"tags":[],"class_list":["post-4988","post","type-post","status-publish","format-standard","hentry","category-project-management","category-scrum"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/4988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/comments?post=4988"}],"version-history":[{"count":22,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/4988\/revisions"}],"predecessor-version":[{"id":12478,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/posts\/4988\/revisions\/12478"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/media?parent=4988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/categories?post=4988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/learn\/es\/wp-json\/wp\/v2\/tags?post=4988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}