{"id":7815,"date":"2024-07-11T15:24:52","date_gmt":"2024-07-11T15:24:52","guid":{"rendered":"https:\/\/plaky.com\/blog\/?p=7815"},"modified":"2024-09-26T00:00:00","modified_gmt":"2024-09-26T00:00:00","slug":"meeting-deadlines","status":"publish","type":"post","link":"https:\/\/plaky.com\/blog\/meeting-deadlines\/","title":{"rendered":"Meeting Deadlines At Work: 10 Fail-Proof Tactics to Try Out"},"content":{"rendered":"\n<p>Meeting deadlines, delivering projects on time, and consistently impressing clients is every project manager&#8217;s dream.<\/p>\n\n\n\n<p>Sadly, it\u2019s not every manager\u2019s reality, especially when juggling multiple projects.&nbsp;<\/p>\n\n\n\n<p>If you\u2019re struggling to please your clients and prevent setbacks, you\u2019re definitely not alone. That said, with preparation and proper mitigation strategies, you can significantly increase your chances of success.<\/p>\n\n\n\n<p>Consider this text your actionable guide for minimizing delays and optimizing your chances of meeting deadlines at work!<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover.png\" alt=\"Meeting deadlines at work - cover\" class=\"wp-image-10550\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover-600x300.png 600w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover-1110x555.png 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover-768x384.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover-18x9.png 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/07\/Meeting-deadlines-at-work-cover-120x60.png 120w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 id=\"what-is-a-deadline\" class=\"wp-block-heading\">What is a deadline?<\/h2>\n\n\n\n<p><strong>A deadline is the latest date by which you must finish a task or project.<\/strong><\/p>\n\n\n\n<p>In business, deadlines typically exist to help us structure our work and prevent us from succumbing to <a href=\"https:\/\/clockify.me\/blog\/managing-time\/parkinsons-law\/\" target=\"_blank\" rel=\"noreferrer noopener\">Parkinson\u2019s Law<\/a>, which states that work will expand to fill the time allotted to it.&nbsp;<\/p>\n\n\n\n<p>In other words, deadlines help us improve task and time management, minimize procrastination, and hold ourselves responsible for the work we do.<\/p>\n\n\n\n<h2 id=\"why-is-it-important-to-meet-deadlines-at-work\" class=\"wp-block-heading\">Why is it important to meet deadlines at work?<\/h2>\n\n\n\n<p>Being able to consistently meet deadlines at work is incredibly beneficial on both a personal and a broader professional level.<\/p>\n\n\n\n<p>On a personal level, meeting deadlines at work helps you avoid stressful situations where you are constantly under pressure from the looming deadline, pulling all-nighters, fueled solely by caffeine and anxiety. Essentially, it helps maintain your mental health and keeps you ready to take on new challenges at work.<\/p>\n\n\n\n<p>On a professional level, consistently meeting deadlines demonstrates your capabilities, professionalism, and efficiency to your superiors or clients, which builds trust and improves your reputation, making people more likely to want to work with you again.<\/p>\n\n\n\n<p>Moreover, doing your work on time increases your productivity, allowing you to take on more work in a shorter period of time. This, in turn, inevitably leads to higher profits.<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>\ud83d\udca1 <strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p>Stay productive and keep tabs on all your deadlines at work by trying out a daily planner app:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/best-daily-planner-apps\/\" target=\"_blank\" rel=\"noreferrer noopener\">18 Best Daily Planner Apps for Greater Productivity<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"10-expert-tips-for-meeting-deadlines-consistently\" class=\"wp-block-heading\">10 expert tips for meeting deadlines consistently<\/h2>\n\n\n\n<p>While it\u2019s true that issues can pop up at any moment without warning and cause delays, we have a few tips for you from reputable experts that will help you prepare for these situations \u2014 and maintain control over your projects.<\/p>\n\n\n\n<h3 id=\"1-specify-project-deliverables\" class=\"wp-block-heading\">1. Specify project deliverables<\/h3>\n\n\n\n<p>The first step on the road to meeting your deadlines is to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Understand the goals of the project, and&nbsp;<\/li>\n\n\n\n<li>Specify the main deliverables you need to create to achieve those goals.<\/li>\n<\/ul>\n\n\n\n<p>To define <a href=\"https:\/\/plaky.com\/learn\/project-management\/deliverable-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project deliverables<\/a> and goals, speak with your key <a href=\"https:\/\/plaky.com\/learn\/project-management\/stakeholder-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">stakeholders<\/a> and understand their needs and expectations.&nbsp;<\/p>\n\n\n\n<p>A clear understanding of what it is your stakeholders want is the foundation for all your future work.&nbsp;<\/p>\n\n\n\n<p>Get it wrong, and, at best, you\u2019ll be forced to backtrack and redo a portion of the work, wasting your time and money in the process. At worst, you\u2019ll lose your client and damage your reputation.&nbsp;<\/p>\n\n\n\n<p>So, make sure to get it right.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Create a list of project deliverables in Plaky<\/a><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"423\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky.png\" alt=\"Always keep your deliverables list handy in your preferred PM tool\" class=\"wp-image-8469\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky-300x106.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky-1024x361.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky-768x271.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Always-keep-your-deliverables-list-handy-in-Plaky-18x6.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Always keep your deliverables list handy in your preferred PM tool<\/figcaption><\/figure>\n<\/div>\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p>Learn how to save time and money on a project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/save-time-and-money-on-a-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">5 Ways to Save Time and Money on a Project<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"2-split-work-into-smaller-tasks\" class=\"wp-block-heading\">2. Split work into smaller tasks<\/h3>\n\n\n\n<p>Once you have your deliverables sorted out, define the work needed to complete them and then break it down into smaller tasks.<\/p>\n\n\n\n<p>Not only will this make the work appear more manageable, but it will also make it easier to <a href=\"https:\/\/plaky.com\/blog\/resource-allocation\/\" target=\"_blank\" rel=\"noreferrer noopener\">allocate project resources<\/a> and create a more accurate estimate of the amount of time needed to complete the work.&nbsp;<\/p>\n\n\n\n<p>This will help you get a better idea of how to tackle the project, says <a href=\"https:\/\/www.linkedin.com\/in\/krissy-metzler\/\" target=\"_blank\" rel=\"noreferrer noopener\">Krissy Metzler<\/a>, Goal Achievement Coach and co-founder of The Goalden System.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg\" alt=\"Krissy Metzler\" class=\"wp-image-7639\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-300x300.jpg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-150x150.jpg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-12x12.jpg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cMany times, we find ourselves jumping into a project too quickly and lumping large tasks together rather than delineating them into individual points. I suggest writing out all of the steps needed and then reviewing the list to incorporate how long you believe each task will take. By taking these 2 steps, you are setting yourself up for gaining a clearer understanding of how you will attack the project.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"862\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks.png\" alt=\"Creating subitems in Plaky would help you split your tasks into more manageable chunks\" class=\"wp-image-8470\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks-300x216.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks-1024x736.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks-768x552.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Creating-subitems-in-Plaky-would-help-you-split-your-tasks-into-more-manageable-chunks-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Creating subitems in Plaky would help you split your tasks into more manageable chunks<\/figcaption><\/figure>\n<\/div>\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p>If you want to know more about how to break down work into smaller tasks, this text might help:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/work-breakdown-structure-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Work Breakdown Structure (WBS) in Project Management<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"3-create-a-project-timeline\" class=\"wp-block-heading\">3. Create a project timeline<\/h3>\n\n\n\n<p>With your work laid out before you, you can now proceed to make time estimates for each task and create a <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-timeline\/\" target=\"_blank\" rel=\"noreferrer noopener\">project timeline<\/a>, complete with all the major milestones and due dates.<\/p>\n\n\n\n<p>Krissy Metzler reveals her process for creating a project timeline.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg\" alt=\"Krissy Metzler\" class=\"wp-image-7639\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-300x300.jpg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-150x150.jpg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-12x12.jpg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cFor example, when a client is faced with a large project, we begin by determining what tasks are involved to complete the project.&nbsp;<\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em>Once we have a list of the actual steps, we are able to reflect and estimate how long each task will take. By working through reflective questions, such as, &#8220;Have I completed a task similar to this prior? If so, how long did it take me?&#8221;, we are able to form a timeline.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The easiest way to create a timeline is to use specialized <a href=\"https:\/\/plaky.com\/gantt-chart-software\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt chart software<\/a>. Gantt charts help visualize the duration of the work and serve as excellent guides for organizing the workload and creating a detailed schedule.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"625\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky.png\" alt=\"Organize your tasks and create accurate estimates using Gantt charts in Plaky\" class=\"wp-image-8476\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky-300x156.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky-1024x533.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky-768x400.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Organize-your-tasks-and-create-accurate-estimates-using-Gantt-charts-in-Plaky-18x9.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Organize your tasks and create accurate estimates using Gantt charts in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Enjoy effortless task management with Plaky<\/a><\/p>\n\n\n\n<h3 id=\"4-leave-buffer-time\" class=\"wp-block-heading\">4. Leave buffer time<\/h3>\n\n\n\n<p>When creating a timeline, Metzler also advises leaving some buffer room for each milestone to account for any surprises that might cause delays and unnecessary stress.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg\" alt=\"Krissy Metzler\" class=\"wp-image-7639\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler.jpg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-300x300.jpg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-150x150.jpg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Krissy-Metzler-12x12.jpg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cOne should always ensure that there is a buffer built into the schedule to alleviate any late-night work sessions or stress. Individuals may find it beneficial to take their list of time-bound tasks and plan backwards, beginning from the due date of the project.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Director of Corporate Strategy and Operations at Twilio and member of the Forbes Business Development Council, <a href=\"https:\/\/www.linkedin.com\/in\/ramsinghaney\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sidharth Ramsinghaney<\/a>, shares how buffers help you stay on schedule.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cWe recently conducted a global M&amp;A integration project where, despite significant benchmark parameters and preparation supporting our timelines, we hit unknown regulatory roadblocks.<\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em> Having built contingencies in our timeline enabled us to navigate through them without derailing the entire project.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<h3 id=\"5-set-realistic-deadlines\" class=\"wp-block-heading\">5. Set realistic deadlines<\/h3>\n\n\n\n<p>And yet, while buffer time helps alleviate some of the stress of tight deadlines and can be extremely useful when unexpected issues arise \u2014 it only works if you set realistic deadlines to begin with.<\/p>\n\n\n\n<p>Ultimately, tall promises can cause more harm than good, highlights Ramsinghaney.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cSetting realistic deadlines is vital. Promising too much can result in burnout and delays. <\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em>I ensure that we stick to realistic timelines by asking if there is sufficient capacity in the team to get it done on time and if any additional risks have been taken into account.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Create a realistic project schedule in Plaky<\/a><\/p>\n\n\n\n<h3 id=\"6-prioritize-tasks\" class=\"wp-block-heading\">6. Prioritize tasks<\/h3>\n\n\n\n<p>Not all tasks carry equal weight. The success and timely delivery of your projects will depend on your ability to effectively prioritize tasks.<\/p>\n\n\n\n<p>In most cases, you\u2019ll be able to identify the minimal viable product (MVP) that will satisfy your stakeholders. All tasks that bring you closer to creating the MVP are must-have tasks and should go on the priority list.<\/p>\n\n\n\n<p>For all intents and purposes, all other tasks can be treated as nice-to-haves and go on the low-priority list.<\/p>\n\n\n\n<p>Splitting your tasks this way will ensure you and your team remain laser-focused on your goal and avoid getting distracted by less important tasks.<\/p>\n\n\n\n<p>Within these 2 task groups, you may want to prioritize further by using high, medium, and low-priority statuses in your <a href=\"https:\/\/plaky.com\/task-management\" target=\"_blank\" rel=\"noreferrer noopener\">task management software<\/a> of choice.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"713\" height=\"511\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Easily-prioritize-tasks-using-custom-statuses-in-Plaky.png\" alt=\"Easily prioritize tasks using custom statuses in Plaky\" class=\"wp-image-8471\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Easily-prioritize-tasks-using-custom-statuses-in-Plaky.png 713w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Easily-prioritize-tasks-using-custom-statuses-in-Plaky-300x215.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Easily-prioritize-tasks-using-custom-statuses-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><figcaption class=\"wp-element-caption\">Easily prioritize tasks using custom statuses in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>However, remember that priorities can and often will change throughout the project. As Ramsinghaney highlights, it\u2019s important to stay flexible so that you can quickly and effectively respond to the new situation.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cFlexibility is key in project management. Sometimes, things might occur that require us to change what\u2019s most important to do. In those situations, it\u2019s important to be able to do what\u2019s most important to get the project successfully back on track.&nbsp;<\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em>For example, during one digital transformation project, we came across a major technical problem that required immediate attention. Our resource agility and tactical priority shift allowed us to address the issue without delay or impact on the project schedule.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>\ud83d\udca1<strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p>Prioritizing your tasks is just one of the ways to organize your workday effectively. Check out the following article, and read about the other tips for planning your daily activities:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/learn\/plaky\/plan-daily-activities\/\" target=\"_blank\" rel=\"noreferrer noopener\">How Do You Organize Your Workday? 9 Tips That Actually Work<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"7-document-project-risks\" class=\"wp-block-heading\">7. Document project risks<\/h3>\n\n\n\n<p>Anything that can affect your project (positively or negatively) and is outside of your <a href=\"https:\/\/plaky.com\/learn\/project-management\/scope-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project scope<\/a> is called a <a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project risk<\/a>.&nbsp;<\/p>\n\n\n\n<p>Potential risks may pop up at any time throughout the project. Some risks may be completely unexpected and unavoidable, while others might never occur. But, keeping a tidy <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-controls\/#Tool_3_Risk_register\" target=\"_blank\" rel=\"noreferrer noopener\">risk register<\/a> from the earliest stages of the project will save you from being blindsided by issues you could have seen coming.<\/p>\n\n\n\n<p>The risk register should be updated throughout the project, and it should contain:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The name of the risk,&nbsp;<\/li>\n\n\n\n<li>Its probability and impact scores,&nbsp;<\/li>\n\n\n\n<li>Owner,&nbsp;<\/li>\n\n\n\n<li>Mitigation measures, and&nbsp;<\/li>\n\n\n\n<li>Mitigation budget, at the very least.<\/li>\n<\/ul>\n\n\n\n<p>With this information at the ready, project managers can stay prepared if something goes wrong and react promptly, or, in some cases, completely sidestep the issue.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"276\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky-1024x276.png\" alt=\"Prevent potential issues by keeping a detailed risk register in Plaky\" class=\"wp-image-8478\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky-1024x276.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky-300x81.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky-768x207.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky-18x5.png 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Prevent-potential-issues-by-keeping-a-detailed-risk-register-in-Plaky.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Prevent potential issues by keeping a detailed risk register in Plaky<\/figcaption><\/figure>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Keep track of your project risks with Plaky<\/a><\/p>\n\n\n\n<h3 id=\"8-delegate-work-evenly\" class=\"wp-block-heading\">8. Delegate work evenly<\/h3>\n\n\n\n<p>While it\u2019s natural to want to give the most important work to the most skilled workers to ensure the quality of the final product, this strategy tends to backfire.<\/p>\n\n\n\n<p>Overburdening a minority of employees with the bulk of the work will only result in delays in the project schedule and the employees\u2019 eventual burnout. Instead, take care to evenly distribute the workload.&nbsp;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"473\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks.png\" alt=\"Keep your team accountable and aware of their responsibilities by assigning them tasks in a PM tool\" class=\"wp-image-8475\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks-300x118.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks-1024x404.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks-768x303.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Keep-your-team-accountable-and-aware-of-their-responsibilities-by-assigning-them-to-tasks-18x7.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Keep your team accountable and aware of their responsibilities by assigning them tasks in a PM tool<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Sometimes, uneven work distribution happens unintentionally and without you noticing. In these situations, using the <a href=\"https:\/\/plaky.com\/help\/manage-project-in-plaky\/board-views\/kanban-view\/\" target=\"_blank\" rel=\"noreferrer noopener\">Kanban view<\/a> can help you detect the issue more quickly than the standard Table view.<\/p>\n\n\n\n<p>Thanks to its visual nature, the Kanban view makes it easy to detect where the bottlenecks are happening and zero in on the cause.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"703\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate.png\" alt=\"Kanban boards can help you detect bottlenecks and solve them before they escalate\" class=\"wp-image-8474\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate-300x176.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate-1024x600.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate-768x450.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Kanban-boards-can-help-you-detect-bottlenecks-and-solve-them-before-they-escalate-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Kanban boards can help you detect bottlenecks and solve them before they escalate<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"9-communicate-with-your-team-and-stakeholders\" class=\"wp-block-heading\">9. Communicate with your team and stakeholders<\/h3>\n\n\n\n<p>According to Ramsinghaney, if you want to stay on track with your project deadlines, encourage transparent communication within and among project teams \u2014 especially those that frequently collaborate.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cA culture that encourages team members to openly share ideas and address concerns can foster better problem-solving and innovation. <\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em>I always encourage collaboration across departments, and push our teams to share ideas, respond transparently, and recommend collaboration approaches.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>This can include:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Leaving feedback in the <a href=\"https:\/\/plaky.com\/features\/comments\" target=\"_blank\" rel=\"noreferrer noopener\">comments section<\/a> of a task,&nbsp;<\/li>\n\n\n\n<li>@mentioning people in conversations that relate to their work,&nbsp;<\/li>\n\n\n\n<li>Sharing <a href=\"https:\/\/plaky.com\/features\/files\" target=\"_blank\" rel=\"noreferrer noopener\">files<\/a>, or&nbsp;<\/li>\n\n\n\n<li>Simply <a href=\"https:\/\/plaky.com\/features\/notifications\" target=\"_blank\" rel=\"noreferrer noopener\">notifying relevant parties<\/a> about the current status of a task.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>Frequent and open communication can help detect potential issues and solve problems \u2014 so use it to your advantage.&nbsp;&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cWhile working on a product strategy initiative, we fostered cross-functional collaboration across engineering, product, ops, GTM, legal, pricing, and packaging and identified creative solutions that helped us achieve the project objectives on schedule ahead of time.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"622\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Enable-better-cross-functional-collaboration-using-Plakys-comment-sectionComments-in-Plaky.png\" alt=\"Enable better cross-functional collaboration by sharing updates and requests in Plaky\u2019s comments sections\" class=\"wp-image-8472\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Enable-better-cross-functional-collaboration-using-Plakys-comment-sectionComments-in-Plaky.png 800w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Enable-better-cross-functional-collaboration-using-Plakys-comment-sectionComments-in-Plaky-300x233.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Enable-better-cross-functional-collaboration-using-Plakys-comment-sectionComments-in-Plaky-768x597.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Enable-better-cross-functional-collaboration-using-Plakys-comment-sectionComments-in-Plaky-15x12.png 15w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption class=\"wp-element-caption\">Enable better <a href=\"https:\/\/plaky.com\/blog\/cross-functional-collaboration\/\" target=\"_blank\" rel=\"noreferrer noopener\">cross-functional collaboration<\/a> by sharing updates and requests in Plaky\u2019s comments sections<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Similarly, as Ramsinghaney tells us, communication with project stakeholders is equally important.<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg\" alt=\"Sidharth Ramsinghaney\" class=\"wp-image-8479\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney.jpeg 500w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-300x300.jpeg 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-150x150.jpeg 150w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Sidharth-Ramsinghaney-12x12.jpeg 12w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cRegular communication is key. I check in with all stakeholders on progress, remove obstacles, and reassess plans with my team.&nbsp;<\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em>In one of my major HR transformation initiatives, I set up weekly status meetings and daily stand-ups, which significantly improved our ability to meet deadlines by ensuring everyone was aligned and any issues were promptly addressed.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The most common way to reach project stakeholders is through periodic <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-status-report\/\" target=\"_blank\" rel=\"noreferrer noopener\">project status reports<\/a>.&nbsp;<\/p>\n\n\n\n<p>Status reports show stakeholders how far along the project is and how it\u2019s progressing. What\u2019s more, they list active project risks or ones that are likely to crop up in the near future.&nbsp;<\/p>\n\n\n\n<p>Status reports are also useful for highlighting these issues and asking for help when necessary.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Encourage transparent collaboration with Plaky<\/a><\/p>\n\n\n\n<h3 id=\"10-monitor-progress\" class=\"wp-block-heading\">10. Monitor progress<\/h3>\n\n\n\n<p>To ensure all your preparation doesn\u2019t go to waste, continue monitoring your progress and updating documentation throughout the project.<\/p>\n\n\n\n<p>The most effective way to monitor progress is to use <a href=\"https:\/\/plaky.com\/project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">project management software<\/a> where all your project information is updated in real time, and you have access to all notifications and <a href=\"https:\/\/plaky.com\/features\/activity-log\" target=\"_blank\" rel=\"noreferrer noopener\">activity logs<\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"919\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board.png\" alt=\"Plaky\u2019s activity log shows a history of all changes made to an item or board\" class=\"wp-image-8477\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board-300x230.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board-1024x784.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board-768x588.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Plakys-activity-log-shows-a-history-of-all-changes-made-on-an-item-or-board-16x12.png 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Plaky\u2019s activity log shows a history of all changes made to an item or board<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Monitoring progress means staying on top of the project at all times and being able to promptly respond to upcoming issues, or prevent them altogether.&nbsp;<\/p>\n\n\n\n<p>This ensures that you minimize the delays that come with unexpected issues and meet even tight deadlines in a timely manner.<\/p>\n\n\n\n<h2 id=\"conquer-your-deadlines-with-plaky-by-cake-com\" class=\"wp-block-heading\">Conquer your deadlines with Plaky by CAKE.com<\/h2>\n\n\n\n<p>Meeting deadlines is never as easy as it seems. But, with careful preparation and reliable project management software at your beck and call, you can maximize your chances of success.<\/p>\n\n\n\n<p>If this sounds like exactly what you need, try <a href=\"https:\/\/plaky.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plaky<\/a> by <a href=\"https:\/\/cake.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">CAKE.com<\/a>.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-embed aligncenter is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Getting Started With Plaky\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/IYQCi9y-lNU?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>Plaky is our project management software with a comprehensive Free Forever plan that will get you organized and confident in meeting your deadlines.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Try Plaky by CAKE.com for free<\/a><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Plaky enables you to improve cross-team collaboration, as well as managerial control over the projects by allowing unlimited users on the free plan.<\/p>\n\n\n\n<p>With this, you kill 2 birds with 1 stone:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Your teams are gathered in one place with tasks seamlessly moving through the pipeline, from one team to another, and&nbsp;<\/li>\n\n\n\n<li>You as the manager get a complete overview of the project and who is working on what, without having to use or pay for different project management tools, each for a different team.<\/li>\n<\/ul>\n\n\n\n<p>This also means that you don\u2019t have to dig for information across multiple channels. Everything you need to manage your tasks, resources, and people is in one place, making it much easier to stay on top of your workload and meet deadlines consistently.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"698\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease.png\" alt=\"Get a complete and customized view of your project to improve your organization and meet deadlines with ease in Plaky\" class=\"wp-image-8473\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease-300x175.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease-1024x596.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease-768x447.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/09\/Get-a-complete-and-customized-view-of-your-project-to-improve-your-organization-and-meet-deadlines-with-ease-18x10.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Get a complete and customized view of your project to improve your organization and meet deadlines with ease in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Plus, regardless of the type of project you\u2019re working on and how you like to organize your data, you have full control over how your virtual office looks and can:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Add or remove fields,&nbsp;<\/li>\n\n\n\n<li>Create custom statuses and labels,&nbsp;<\/li>\n\n\n\n<li>Switch between Table, Kanban, and Gantt views,&nbsp;<\/li>\n\n\n\n<li>Customize colors,&nbsp;<\/li>\n\n\n\n<li>Filter and sort the data any way you like, and so much more.&nbsp;<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Plaky Tutorial: Creating Boards\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/5z7uDcfgfhw?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>Remember \u2014 an organized workspace will ensure that you can always access the information you need at a glance and assess the situation to make sure:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Your workload doesn\u2019t spiral out of control and&nbsp;<\/li>\n\n\n\n<li>You finish everything on time.<\/li>\n<\/ul>\n\n\n\n<p><em>Never miss a deadline again \u2014 organize your projects and manage tasks and teams with Plaky by CAKE.com.<\/em><\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>10 fail-proof strategies for meeting deadlines: 1. Specify project deliverables 2. Split work into smaller tasks 3. Create a project timeline 4. Leave buffer time<\/p>\n","protected":false},"author":38,"featured_media":10550,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-7815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/comments?post=7815"}],"version-history":[{"count":31,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7815\/revisions"}],"predecessor-version":[{"id":16857,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7815\/revisions\/16857"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media\/10550"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media?parent=7815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/categories?post=7815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/tags?post=7815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}