{"id":7598,"date":"2024-06-11T11:23:06","date_gmt":"2024-06-11T11:23:06","guid":{"rendered":"https:\/\/plaky.com\/blog\/?p=7598"},"modified":"2026-03-05T12:05:04","modified_gmt":"2026-03-05T12:05:04","slug":"identify-and-solve-bottlenecks-with-kanban","status":"publish","type":"post","link":"https:\/\/plaky.com\/blog\/identify-and-solve-bottlenecks-with-kanban\/","title":{"rendered":"Identify and Solve Bottlenecks With Kanban: A 3-Step Tutorial"},"content":{"rendered":"\n<p>Do you feel like your projects get stuck because of bottlenecks way too often, slowing down project progress and causing delays in the <a href=\"https:\/\/plaky.com\/blog\/project-management-workflow\/\" target=\"_blank\" rel=\"noreferrer noopener\">project workflow<\/a>?<\/p>\n\n\n\n<p>A simple and efficient way to detect and solve bottlenecks \u2014 the famous <a href=\"https:\/\/plaky.com\/learn\/project-management\/kanban-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Kanban<\/a> framework \u2014 is a great choice whether you\u2019re an experienced project manager or just starting your journey in this profession.<\/p>\n\n\n\n<p>Keep scrolling to learn more!<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover.png\" alt=\"Solve bottlenecks with Kanban - cover\" class=\"wp-image-10533\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover-600x300.png 600w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover-1110x555.png 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover-768x384.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover-18x9.png 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Solve-bottlenecks-with-Kanban-cover-120x60.png 120w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 id=\"1-visualize-workflow\" class=\"wp-block-heading\">1. Visualize workflow<\/h2>\n\n\n\n<p>Back when digital project management tools didn\u2019t exist, a Kanban board was an actual board with sticky notes. Nowadays, project visualization is simplified with software such as <a href=\"https:\/\/plaky.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plaky<\/a> by <a href=\"https:\/\/cake.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">CAKE.com<\/a>.<\/p>\n\n\n\n<p>Reliable and user-friendly, Plaky lets you break down your projects into as many steps or stages as needed. The app is organized into spaces, <a href=\"https:\/\/plaky.com\/features\/board\" target=\"_blank\" rel=\"noreferrer noopener\">boards<\/a>, and <a href=\"https:\/\/plaky.com\/features\/items\" target=\"_blank\" rel=\"noreferrer noopener\">items<\/a>, with unlimited users even in the free plan.<\/p>\n\n\n\n<p>To visualize a project, you may list items, i.e., project tasks, in the default Table view and then switch to Kanban, or use the <a href=\"https:\/\/plaky.com\/blog\/identify-and-solve-bottlenecks-with-kanban\/\" target=\"_blank\" rel=\"noreferrer noopener\">Kanban view<\/a> immediately to start adding tasks.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"528\" height=\"741\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Adding-Kanban-board-view-in-Plaky.png\" alt=\"Adding Kanban board view in Plaky\" class=\"wp-image-7590\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Adding-Kanban-board-view-in-Plaky.png 528w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Adding-Kanban-board-view-in-Plaky-214x300.png 214w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Adding-Kanban-board-view-in-Plaky-9x12.png 9w\" sizes=\"auto, (max-width: 528px) 100vw, 528px\" \/><figcaption class=\"wp-element-caption\">Adding Kanban board view in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>To categorize items \u2014 or Kanban cards in this case \u2014 assign them labels indicating the progress status, such as To do, Doing, and Done. You may use additional categories: Review, On hold, Canceled, and more, depending on your needs.<\/p>\n\n\n\n<p>Plaky allows you to name the labels whatever you like and choose their representative colors.<\/p>\n\n\n\n<p>Thanks to Plaky\u2019s highly <a href=\"https:\/\/plaky.com\/features\/fields\" target=\"_blank\" rel=\"noreferrer noopener\">customizable fields<\/a>, you can also specify deadlines, assignees, budgets, relevant links, etc.<\/p>\n\n\n\n<p>The Kanban view is linear, and work is pulled from left to right, meaning items further to the right are closest to completion.<\/p>\n\n\n\n<p>All the information is displayed neatly, and items are grouped into columns according to their status, which is essential for the next step.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"664\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky.png\" alt=\"Kanban view in Plaky\" class=\"wp-image-7594\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky-300x166.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky-1024x567.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky-768x425.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Kanban-view-in-Plaky-18x10.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Kanban view in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Create a Kanban board in Plaky<\/a><\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>\ud83d\udca1 <strong>Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p>Wondering which Kanban tool to go for? Check out the app comparison overview below:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/best-kanban-software\/\" target=\"_blank\" rel=\"noreferrer noopener\">12 Best Kanban Software Solutions Tested &amp; Reviewed<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"2-identify-bottlenecks-with-the-wip-limit\" class=\"wp-block-heading\">2. Identify bottlenecks with the WIP limit<\/h2>\n\n\n\n<p>Detecting bottlenecks as soon as possible will help get your project back on track, so monitor task progress on the Kanban board regularly.<\/p>\n\n\n\n<p>The so-called <a href=\"https:\/\/plaky.com\/learn\/project-management\/kanban-project-management\/#Principle_3_Limit_WIP\" target=\"_blank\" rel=\"noreferrer noopener\">work in progress (WIP) limit<\/a> is a term you should get familiar with. It refers to restricting the maximum number of items in Kanban board columns.<\/p>\n\n\n\n<p>There\u2019s no single way to determine the WIP limit, but it\u2019s common to calculate it as the number of <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-roles\/\" target=\"_blank\" rel=\"noreferrer noopener\">project team members<\/a> plus 1.&nbsp;<\/p>\n\n\n\n<p>Bottlenecks, therefore, typically manifest as columns surpassing the WIP limit.<\/p>\n\n\n\n<p>To go even further, you must identify what kind of a bottleneck it is \u2014 a piece of equipment, a department, limited resources, and so on. This is where PM software comes in handy, offering a comprehensive overview.<\/p>\n\n\n\n<p>Let\u2019s take a look at a very simple example of a Kanban board:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"703\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky.png\" alt=\"Bottleneck identification example in Plaky\" class=\"wp-image-7591\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky-300x176.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky-1024x600.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky-768x450.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Bottleneck-identification-example-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Bottleneck identification example in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>In the example above, the On hold column contains the highest number of items. Observing the column more closely, you\u2019ll notice that all the tasks have a common denominator \u2014 the same assignee.<\/p>\n\n\n\n<p>Examining other columns, you\u2019ll see this person is in charge of several tasks, only one of which is underway.<\/p>\n\n\n\n<p>The logical conclusion is that the team member is stuck on their only task in progress, and they generally have too much on their plate.<\/p>\n\n\n\n<p>This leads us to the next step.<\/p>\n\n\n\n<p class=\"custom-btn\"><a data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Try Plaky by CAKE.com for free<\/a><\/p>\n\n\n\n<h2 id=\"3-seek-causes-and-solutions\" class=\"wp-block-heading\">3. Seek causes and solutions<\/h2>\n\n\n\n<p>Looking into the root of the problem helps you prevent bottlenecks from occurring again in the same project and future ones.<\/p>\n\n\n\n<p>For instance, if a bottleneck revolves around a team member, it\u2019s likely a case of work overload or unclear instructions. The solution is to <a href=\"https:\/\/plaky.com\/blog\/delegating-tasks\/\" target=\"_blank\" rel=\"noreferrer noopener\">delegate tasks<\/a> differently, improve communication, and offer support.<\/p>\n\n\n\n<p>Similarly, if a certain department appears to be causing congestion, you need to foster better coordination between departments, which can be done through regular meetings and collaborative platforms.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1356\" height=\"632\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky.png\" alt=\"Leaving comments in Plaky\" class=\"wp-image-7595\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky.png 1356w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky-300x140.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky-1024x477.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky-768x358.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Leaving-comments-in-Plaky-18x8.png 18w\" sizes=\"auto, (max-width: 1356px) 100vw, 1356px\" \/><figcaption class=\"wp-element-caption\">Leaving comments in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Whatever the reason, you\u2019ll often find that the solution lies in adequate <a href=\"https:\/\/plaky.com\/blog\/resource-allocation\/\" target=\"_blank\" rel=\"noreferrer noopener\">resource allocation<\/a>, clear communication, and regular monitoring.<\/p>\n\n\n\n<p>Using a centralized platform is the easiest way to track projects, ensure everyone\u2019s on the same page, and tackle bottlenecks. Plaky by CAKE.com is an excellent choice if you\u2019re looking for a powerful and affordable <a href=\"https:\/\/plaky.com\/task-management\" target=\"_blank\" rel=\"noreferrer noopener\">task management tool<\/a>.<\/p>\n\n\n\n<p>Need to assign a task to someone? Just tag the team member in the Person field of the item in question, and they\u2019ll receive a notification.<\/p>\n\n\n\n<p>If your tasks require prioritization (which is almost always the case), simply create a Priority column and configure as many degrees as you need.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"410\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky.png\" alt=\"Priority labels in Plaky\" class=\"wp-image-7597\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky-300x103.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky-1024x350.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky-768x262.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Priority-labels-in-Plaky-18x6.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Priority labels in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Plaky also allows you to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Upload files,<\/li>\n\n\n\n<li>Filter tasks by priority, due date, status, etc.,<\/li>\n\n\n\n<li>Choose from a variety of customizable <a href=\"https:\/\/plaky.com\/templates\/\" target=\"_blank\" rel=\"noreferrer noopener\">project templates<\/a>, and more.<\/li>\n<\/ul>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Improve task management with Plaky<\/a><\/p>\n\n\n\n<h2 id=\"get-rid-of-bottlenecks-with-plaky-by-cake-com\" class=\"wp-block-heading\">Get rid of bottlenecks with Plaky by CAKE.com<\/h2>\n\n\n\n<p>If you want your projects to run at their optimal capacity, detecting and eliminating bottlenecks promptly is key. Thanks to modern PM tools, this doesn\u2019t have to be a huge nuisance \u2014 let Plaky assist you.<\/p>\n\n\n\n<p>Flexible, cost-effective, and easy to navigate, Plaky helps teams of all sizes across numerous industries track their projects. Depending on your needs, check out the different <a href=\"https:\/\/plaky.com\/pricing\" target=\"_blank\" rel=\"noreferrer noopener\">pricing options<\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"877\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans.png\" alt=\"Plaky pricing plans\" class=\"wp-image-7596\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans-300x219.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans-1024x748.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans-768x561.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/06\/Plaky-pricing-plans-16x12.png 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Plaky pricing plans<\/figcaption><\/figure>\n<\/div>\n\n\n<p>To take your PM experience to the next level, try the <a href=\"https:\/\/cake.com\/bundle\" target=\"_blank\" rel=\"noreferrer noopener\">CAKE.com Bundle<\/a>. It gives you access to the highest possible plan on each of our products. In addition to Plaky, the offer includes Pumble for business communication and Clockify for time tracking.<\/p>\n\n\n\n<p><em>Say goodbye to bottlenecks and keep all your project information safe on one centralized platform \u2014 try Plaky by CAKE.com for free now.<\/em><\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>3 easy steps for handling bottlenecks with Kanban \u00b7 1. Visualize workflow \u00b7 2. Identify congestions \u00b7 3. Seek causes and solutions<\/p>\n","protected":false},"author":28,"featured_media":10533,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-7598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/comments?post=7598"}],"version-history":[{"count":20,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7598\/revisions"}],"predecessor-version":[{"id":16887,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7598\/revisions\/16887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media\/10533"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media?parent=7598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/categories?post=7598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/tags?post=7598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}