{"id":7494,"date":"2024-05-28T11:50:12","date_gmt":"2024-05-28T11:50:12","guid":{"rendered":"https:\/\/plaky.com\/blog\/?p=7494"},"modified":"2026-03-05T12:10:58","modified_gmt":"2026-03-05T12:10:58","slug":"project-takeover","status":"publish","type":"post","link":"https:\/\/plaky.com\/blog\/project-takeover\/","title":{"rendered":"Smooth Project Takeover: 4 Key Success Tips"},"content":{"rendered":"\n<p>Joining a project<em> <\/em>halfway through can feel like entering a labyrinth without a map. You may face missed <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-milestones\/\" target=\"_blank\" rel=\"noreferrer noopener\">project milestones<\/a>, frustrated team members, cost overruns, and other project manager nightmares.<\/p>\n\n\n\n<p>Don\u2019t let the prospect of a turbulent project takeover discourage you!<\/p>\n\n\n\n<p>If you implement our tips, you\u2019ll be able to turn the challenges into opportunities for transformation and success.<\/p>\n\n\n\n<p>Let\u2019s dive in!<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover.png\" alt=\"Project takeover - cover\" class=\"wp-image-10524\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover-600x300.png 600w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover-1110x555.png 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover-768x384.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover-18x9.png 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-takeover-cover-120x60.png 120w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 id=\"1-meet-with-the-original-manager\" class=\"wp-block-heading\">1. Meet with the original manager<\/h2>\n\n\n\n<p>If possible, arrange a meeting with the original manager of the project you\u2019re inheriting. This person is likely to provide valuable insights.<\/p>\n\n\n\n<p>For instance, the original manager can specify the best way to get familiar with the project&#8217;s history, objectives, <a href=\"https:\/\/plaky.com\/learn\/project-management\/deliverable-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">deliverables<\/a>, etc.<\/p>\n\n\n\n<p>This is also an excellent opportunity to hear about <a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project risks<\/a> and issues as well, especially since some of them may not have been officially documented.<\/p>\n\n\n\n<p>If, for some reason, this meeting can\u2019t take place, don\u2019t worry \u2014 you can still gather all the relevant information through formal documents.<\/p>\n\n\n\n<h2 id=\"2-go-through-the-existing-project-documentation\" class=\"wp-block-heading\">2. Go through the existing project documentation<\/h2>\n\n\n\n<p>When picking up an ongoing project, get your hands on whatever documents are available, especially the <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-plan-templates\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management plan<\/a>.<\/p>\n\n\n\n<p>This comprehensive plan covers numerous aspects of the project. Pay special attention to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project goals,<\/li>\n\n\n\n<li>Timeline,<\/li>\n\n\n\n<li>Budget, and<\/li>\n\n\n\n<li>Potential risks.<\/li>\n<\/ul>\n\n\n\n<p>It\u2019s best to keep all the relevant data in a centralized project management platform. If your company doesn\u2019t rely on one or if you find that the software used could be more practical, consider <a href=\"https:\/\/plaky.com\/\">Plaky<\/a> by <a href=\"https:\/\/cake.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">CAKE.com<\/a>, a simple yet reliable project management tool.<\/p>\n\n\n\n<p>Everything described in the project management plan can be transferred to Plaky for clear visualization and monitoring.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n\n\n\n<h3 id=\"get-familiar-with-the-project-goals-and-timeline\" class=\"wp-block-heading\">Get familiar with the project goals and timeline<\/h3>\n\n\n\n<p>Familiarize yourself with the goals immediately upon taking over a project to ensure that time, focus, and resources are used efficiently.<\/p>\n\n\n\n<p>If you\u2019re looking for an easy way to track goals, Plaky by CAKE.com is an excellent choice. The platform lets you create boards for different activities or periods, for example. Use different custom field types to provide any task details necessary:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Text,<\/li>\n\n\n\n<li>Numbers,<\/li>\n\n\n\n<li>Link,<\/li>\n\n\n\n<li>Person,<\/li>\n\n\n\n<li>Date, and more.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1172\" height=\"700\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky.png\" alt=\"Custom fields in Plaky\" class=\"wp-image-7488\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky.png 1172w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky-300x179.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky-1024x612.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky-768x459.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Custom-fields-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 1172px) 100vw, 1172px\" \/><figcaption class=\"wp-element-caption\">Custom fields in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Naturally, each goal has a designated due date that can be easily visualized using the <a href=\"https:\/\/plaky.com\/gantt-chart-software\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt chart<\/a>. The Gantt chart view is perfect for visualizing project phases, individual activities, deadlines, <a href=\"https:\/\/plaky.com\/learn\/project-management\/dependencies-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">task dependencies<\/a>, and more.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"702\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky.png\" alt=\"Gantt chart view in Plaky\" class=\"wp-image-7489\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky-300x176.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky-1024x599.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky-768x449.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Gantt-chart-view-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Gantt chart view in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>If not already available, we highly recommend you make a chart like this for the <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-timeline\/\" target=\"_blank\" rel=\"noreferrer noopener\">project timeline <\/a>when taking charge of an existing project.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 PLAKY PRO TIP<\/strong><\/p>\n\n\n\n<p>If you want to see more instances of Gantt charts, check out this article:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/gantt-chart-examples\/\" target=\"_blank\" rel=\"noreferrer noopener\">8 Gantt Chart Examples to Improve Your Project Management<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"consider-the-project-budget\" class=\"wp-block-heading\">Consider the project budget<\/h3>\n\n\n\n<p>Every project has a plan describing how much can be spent during each phase. Being aligned with the budget plan is essential for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cost control,&nbsp;<\/li>\n\n\n\n<li>Effective decision-making, and&nbsp;<\/li>\n\n\n\n<li>Overall project success.<\/li>\n<\/ul>\n\n\n\n<p>To ensure you have an accurate insight into budget matters upon taking over a project, we suggest keeping the costs of all the project expenses \u2014 such as equipment purchasing, marketing materials, professional fees, etc. \u2014 in one place.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1153\" height=\"679\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky.png\" alt=\"Project budgeting in Plaky\" class=\"wp-image-7492\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky.png 1153w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky-300x177.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky-1024x603.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky-768x452.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Project-budgeting-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 1153px) 100vw, 1153px\" \/><figcaption class=\"wp-element-caption\">Project budgeting in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>In addition to the specific monetary amounts, budget information can entail different status categories, people in charge, links to relevant documents, and more, whatever helps your team stay on track.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 PLAKY PRO TIP<\/strong><\/p>\n\n\n\n<p>To find out more about the importance of budgeting and the different methods you can use, read this article:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/project-management-budgeting-methods\/\" target=\"_blank\" rel=\"noreferrer noopener\">Best Project Management Budgeting Methods to Try<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"look-at-the-project-risks\" class=\"wp-block-heading\">Look at the project risks<\/h3>\n\n\n\n<p>Effective <a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-management-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project risk management<\/a> starts even before the project does, so you need to catch up when stepping into ongoing activities. Look for a risk log and keep it at hand to prevent oversights and enable prompt risk mitigation.<\/p>\n\n\n\n<p>Although a list of risks can be created in various programs, it\u2019s much easier to have it on a platform like Plaky where relevant users can always access it.<\/p>\n\n\n\n<p class=\"custom-btn\"><a data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Try Plaky by CAKE.com for free<\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"324\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky.png\" alt=\"Risk register example in Plaky\" class=\"wp-image-7493\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky-300x81.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky-1024x276.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky-768x207.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Risk-register-example-in-Plaky-18x5.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Risk register example in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>You could create risk probability and severity categories with as many degrees as you wish, assign a risk owner, define mitigation measures, and so on.<\/p>\n\n\n\n<h2 id=\"3-build-rapport-with-the-project-team-and-stakeholders\" class=\"wp-block-heading\">3. Build rapport with the project team and stakeholders<\/h2>\n\n\n\n<p>Once you\u2019ve familiarized yourself with the project, it\u2019s time to do the same with the internal team and the <a href=\"https:\/\/plaky.com\/learn\/project-management\/stakeholder-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">stakeholders<\/a>.<\/p>\n\n\n\n<p>Meeting with the project team will allow you to learn more about everyone\u2019s roles, discuss the project as a whole, obtain information you couldn\u2019t gather from the documentation, and more.<\/p>\n\n\n\n<p>Furthermore, reaching out to the key stakeholders is a must when taking over a project. Your objective is to understand their needs and exhibit your competence.<\/p>\n\n\n\n<p>Since remote work has become so common, it\u2019s not always easy to establish rapport and make everyone feel part of the conversation, but modern times come with modern solutions. Platforms such as Plaky by CAKE.com where everyone can share thoughts and ideas foster team collaboration.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Create a free Plaky account<\/a><\/p>\n\n\n\n<p>While official requests and longer messages are typically sent via email, Plaky allows for smooth communication both with colleagues and external collaborators when it comes to short messages and concrete actions.<\/p>\n\n\n\n<p>Every item in Plaky comes with a comment section, perfect for remarks, reminders, and observations.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"345\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky.png\" alt=\"Leaving comments in Plaky\" class=\"wp-image-7491\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky-300x86.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky-1024x294.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky-768x221.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Leaving-comments-in-Plaky-18x5.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Leaving comments in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>To ensure better control of the workspace while connecting people, Plaky offers different user roles:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Owner,<\/li>\n\n\n\n<li>Admin,<\/li>\n\n\n\n<li>Member, and<\/li>\n\n\n\n<li>Viewer (available on paid plans only).<\/li>\n<\/ul>\n\n\n\n<p>To learn more about the features coming with the different Plaky roles and permissions, we suggest watching this short video:<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Plaky Tutorial: Roles and Permissions\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/Q0KVrVvYqPw?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 id=\"4-establish-a-regular-monitoring-and-control-process\" class=\"wp-block-heading\">4. Establish a regular monitoring and control process<\/h2>\n\n\n\n<p>Once you\u2019ve officially taken over a project and established your aims and methods of achieving them, you need a regular <a href=\"https:\/\/plaky.com\/learn\/project-management\/phases-project-management\/#Phase_4_Project_Monitoring_and_Control\" target=\"_blank\" rel=\"noreferrer noopener\">project monitoring and control<\/a> procedure to ensure everything stays on track.<\/p>\n\n\n\n<p>The way you observe progress can vary from project to project, but essentially, you need to keep a close eye on the <a href=\"https:\/\/plaky.com\/blog\/kpi-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Key Performance Indicators<\/a> (KPIs), implemented changes, risks, and costs.<\/p>\n\n\n\n<p>If you want to simplify project tracking, Plaky by CAKE.com is the answer. The platform lets you create as many spaces (open or closed), boards, and items as you need, invite users, choose from a variety of <a href=\"https:\/\/plaky.com\/templates\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management templates<\/a>, and more.<\/p>\n\n\n\n<p>Apart from the previously mentioned Gantt chart view, Plaky offers Table and <a href=\"https:\/\/plaky.com\/help\/manage-project-in-plaky\/board-views\/kanban-view\/\" target=\"_blank\" rel=\"noreferrer noopener\">Kanban view<\/a> options as well. For paid plan users, there\u2019s also the so-called private view, visible to nobody in the team but its creator.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"224\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky-1024x224.png\" alt=\"Adding a board view in Plaky\" class=\"wp-image-7487\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky-1024x224.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky-300x66.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky-768x168.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky-18x4.png 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Adding-a-board-view-in-Plaky.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Adding a board view in Plaky<\/figcaption><\/figure>\n\n\n\n<p>Another feature that comes in handy in terms of project monitoring is the <a href=\"https:\/\/plaky.com\/features\/activity-log\" target=\"_blank\" rel=\"noreferrer noopener\">Activity log<\/a>. Your team members don\u2019t need to report on every little update \u2014 the activity log shows changes in the task status, due dates, newly created items, and so forth.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"810\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky.png\" alt=\"Item activity log in Plaky\" class=\"wp-image-7490\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky.png 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky-300x203.png 300w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky-1024x691.png 1024w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky-768x518.png 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2024\/05\/Item-activity-log-in-Plaky-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Item activity log in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p>In sum, Plaky\u2019s detailed yet simple overview ensures precision and transparency, maintaining project quality and stakeholder satisfaction.<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Monitor your project&#8217;s performance in Plaky<\/a><\/p>\n\n\n\n<h2 id=\"use-plaky-by-cake-com-for-a-smooth-project-takeover\" class=\"wp-block-heading\">Use Plaky by CAKE.com for a smooth project takeover<\/h2>\n\n\n\n<p>As mentioned earlier, Plaky\u2019s flexibility and user-friendliness can notably facilitate taking over an existing project.&nbsp;<\/p>\n\n\n\n<p>Plaky would also be a huge help in handing over a project to a colleague in case you ever take a leave of absence.<\/p>\n\n\n\n<p><em>Enjoy streamlined project takeovers and centralized management. Sign up for Plaky by CAKE.com now.<\/em><\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.plaky.com\/signup\" data-type=\"link\" data-id=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Get started with Plaky<\/a><\/p>\n\n\n\n<p>\n<div class=\"container plaky-gradient-bundle pt-5 ps-lg-5 z-0 mb-5  \" >\n    <div class=\"d-flex flex-column flex-lg-row align-items-center justify-content-center justify-content-lg-between gap-1 gap-lg-5\">\n        <div class=\"banner-text text-center text-lg-start text-white\">\n            <span class=\"translation-block lh-1 fs-16 text-white\">\n                Try CAKE.com Bundle            <\/span>\n            <p class=\"translation-block mw-300 fs-12 mb-2\">For an optimal project management experience, consider exploring the CAKE.com Bundle deal, adding the team communication app Pumble and time tracking tool Clockify into the offer.<\/p>\n            <div class=\"cta-btns pt-4 d-flex align-items-center justify-content-center justify-content-lg-start gap-4 mb-4 mb-lg-0\">\n                <a aria-label=\"Sign up\" href=\"https:\/\/cake.com\/try\" class=\"btn rounded py-1 px-2 fs-12 btn-light\">\n                    Sign up                <\/a>\n                                <a aria-label=\"Learn more\" class=\"text-white px-2 fs-12\" target=\"_blank\" href=\"https:\/\/cake.com\/bundle\">\n                    Learn more                <\/a>\n                            <\/div>\n        <\/div>\n        <picture>\n            <source srcset=\"https:\/\/plaky.com\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/bundle@2x.png 2x\" alt=\"Plaky logo\" media=\"(min-width: 998px)\" \/>\n            <img decoding=\"async\" class=\"max-w-350 img-fluid \" src=\"https:\/\/plaky.com\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/bundle.png\" alt=\"Plaky screenshot\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n\n\n    <br><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Practical tips for taking over an existing project \u00b7 1. Meet with the original manager \u00b7 2. Go through the existing project documentation \u00b7 3. Build rapport<\/p>\n","protected":false},"author":28,"featured_media":10524,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-7494","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/comments?post=7494"}],"version-history":[{"count":24,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7494\/revisions"}],"predecessor-version":[{"id":16894,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/7494\/revisions\/16894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media\/10524"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media?parent=7494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/categories?post=7494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/tags?post=7494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}