{"id":1125,"date":"2022-10-06T14:33:01","date_gmt":"2022-10-06T14:33:01","guid":{"rendered":"https:\/\/plaky.com\/blog\/?p=1125"},"modified":"2026-06-04T00:00:00","modified_gmt":"2026-06-04T00:00:00","slug":"project-integration-management","status":"publish","type":"post","link":"https:\/\/plaky.com\/blog\/project-integration-management\/","title":{"rendered":"Project Integration Management \u2014 7 Processes for Project Control"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Most projects start off looking organized, with formal plans about teams, tools, and timelines. But no amount of planning is helpful unless you manage the connections between these plans throughout the project life cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What you need is project integration management \u2014 processes that ensure all project elements fit together in practice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Keep reading to see all the important definitions, tips, and tools!<\/p>\n\n\n\n<ul class=\"wp-block-list key-takeaways\">\n<li>Project integration management is about keeping all project parts aligned.<\/li>\n\n\n\n<li>The 7 integration processes guide a project from initiation through planning, execution, monitoring, change control, and closure.<\/li>\n\n\n\n<li>Strong integration management minimizes working in silos and boosts the chances of project success.<\/li>\n\n\n\n<li>Effective integration relies on various tools and techniques for maintaining visibility and coordination.<\/li>\n<\/ul>\n\n\n\n<h2 id=\"what-is-project-integration-management\" class=\"wp-block-heading\">What is project integration management?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Project integration management means <strong>coordinating all project elements (people, tasks, resources, timelines, and risks) to ensure they work together as one unified system.&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Every part of a project needs to align with the overall business objectives, and changes in one area shouldn\u2019t negatively impact another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, imagine a marketing agency launching a new website for a client. Although the design team, developers, content writers, SEO specialists, and account managers all have different responsibilities, they need to be coordinated at all times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Say the client requests a major design change midway through the project \u2014 integration management helps assess how that change will affect development time, budget, content production, and launch deadlines before decisions are made.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Without project integration management, these teams would likely face issues like <a href=\"https:\/\/plaky.com\/learn\/project-management\/scope-creep-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">scope creep<\/a>, duplicated work, unrealistic due dates, and so on.<\/p>\n\n\n\n<h3 id=\"what-is-the-difference-between-project-management-and-project-integration-management\" class=\"wp-block-heading\">What is the difference between project management and project integration management?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Project management entails planning, executing, and delivering a project from start to finish.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Project integration management is one specific knowledge area within project management that focuses on unifying all moving parts of a project instead of letting them become a set of isolated tasks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\n<div class=\"container plaky-gradient-features pt-5 ps-lg-5 z-0 mb-5 pb-lg-4 \" >\n    <div class=\"d-flex flex-column flex-lg-row align-items-center justify-content-center justify-content-lg-between gap-1 gap-lg-5\">\n        <div class=\"banner-text text-center text-lg-start text-white\">\n            <span class=\"translation-block lh-1 fs-16 text-white\">\n                Intuitive PM tool            <\/span>\n            <p class=\"translation-block mw-300 fs-12 mb-2\">Coordinate tasks, teammates, and resources in a flexible yet user-friendly tool \u2014 Plaky by CAKE.com.<\/p>\n            <div class=\"cta-btns pt-4 d-flex align-items-center justify-content-center justify-content-lg-start gap-4 mb-4 mb-lg-0\">\n                <a aria-label=\"Sign up\" href=\"https:\/\/app.plaky.com\/signup\" class=\"btn rounded py-1 px-2 fs-12 btn-light\">\n                    Sign up                <\/a>\n                                <a aria-label=\"Learn more\" class=\"text-white px-2 fs-12\" target=\"_blank\" href=\"https:\/\/plaky.com\/project-management-software\">\n                    Learn more                <\/a>\n                            <\/div>\n        <\/div>\n        <picture>\n            <source srcset=\"https:\/\/plaky.com\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/features@2x.png 2x\" alt=\"Plaky logo\" media=\"(min-width: 998px)\" \/>\n            <img decoding=\"async\" class=\"max-w-350 img-fluid \" src=\"https:\/\/plaky.com\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/features.png\" alt=\"Plaky screenshot\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n\n\n    <\/p>\n\n\n\n<h2 id=\"the-7-processes-of-project-integration-management\" class=\"wp-block-heading\">The 7 processes of project integration management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.pmi.org\/standards\/pmbok\" target=\"_blank\" rel=\"noreferrer noopener\">Project Management Body of Knowledge (PMBOK)<\/a> outlines the following 7 project integration management processes.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1369\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management.webp\" alt=\"The 7 processes of project integration management\" class=\"wp-image-17921\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management.webp 1200w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management-263x300.webp 263w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management-898x1024.webp 898w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management-768x876.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/The-7-processes-of-project-integration-management-11x12.webp 11w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h3 id=\"1-develop-a-project-charter\" class=\"wp-block-heading\">#1 Develop a project charter<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The process of developing a <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-charter\/\" target=\"_blank\" rel=\"noreferrer noopener\">project charter<\/a> is the formal start of a project, <strong>outlining what it is intended to achieve.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, a project charter is a key document that aligns <a href=\"https:\/\/plaky.com\/learn\/project-management\/stakeholder-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project stakeholders<\/a> in terms of purpose, direction, and expectations before detailed planning begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project charter typically involves elements such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project title<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/scope-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project scope<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/deliverable-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project deliverables<\/a><\/li>\n\n\n\n<li>Success criteria<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/project-milestones\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project milestones<\/a><\/li>\n\n\n\n<li>Project risks<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">While not a detailed plan, the project charter sets clear boundaries that guide all future project decisions.<\/p>\n\n\n\n<p class=\"custom-btn wp-block-paragraph\"><a href=\"https:\/\/docs.google.com\/document\/d\/18ri9kbLRRE6gZ0_UsSCFqOT8eqALv5Rangl3E2NPzYE\/copy\" target=\"_blank\" rel=\"noreferrer noopener\">Get a free project charter template<\/a>&nbsp;<\/p>\n\n\n\n<h3 id=\"2-develop-a-project-management-plan\" class=\"wp-block-heading\">#2 Develop a project management plan<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The process of developing a <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-plan-templates\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management plan<\/a> is where your project moves from a high-level idea into a<strong> structured, actionable roadmap<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project management plan defines how the work will actually be done by bringing together all subsidiary plans into one unified document, i.e., a collection of management plans covering aspects such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Scope<\/li>\n\n\n\n<li>Schedule<\/li>\n\n\n\n<li>Cost<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/project-resources\/\" target=\"_blank\" rel=\"noreferrer noopener\">Resources<\/a><\/li>\n\n\n\n<li>Communication<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Risks<\/a>&nbsp;<\/li>\n\n\n\n<li>Procurement<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s also essential to establish <a href=\"https:\/\/plaky.com\/learn\/project-management\/baseline-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project baselines<\/a> \u2014 the approved versions of the project scope, timeline, and budget serving as reference points throughout the project life cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Importantly, the project management plan is a living document that can be updated as new information, constraints, or approved changes emerge.<\/p>\n\n\n\n<h3 id=\"3-direct-and-manage-project-work\" class=\"wp-block-heading\">#3 Direct and manage project work<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once project execution begins, teams start <strong>performing the tasks, producing deliverables, and carrying out the day-to-day work<\/strong> required to reach the project objectives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The central role belongs to <a href=\"https:\/\/plaky.com\/learn\/project-management\/what-project-managers-do\/\" target=\"_blank\" rel=\"noreferrer noopener\">project managers<\/a> \u2014 organizing workflows, resolving issues, and supporting communication between teams. Because projects are dynamic, managers often need to balance priorities, budgets, and stakeholder expectations simultaneously.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What\u2019s especially useful during the project execution stage is <a href=\"https:\/\/plaky.com\/project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">project management software<\/a>. A reliable PM tool helps you:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Assign tasks<\/li>\n\n\n\n<li>Define deadlines<\/li>\n\n\n\n<li>Manage workloads<\/li>\n\n\n\n<li>Keep communication centralized&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Since multiple activities happen at the same time during execution, having a shared system enhances visibility and reduces the risk of missed updates or bottlenecks.<\/p>\n\n\n\n<p class=\"custom-btn wp-block-paragraph\"><a href=\"https:\/\/app.plaky.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Try a neat PM app \u2014 Plaky<\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1054\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool.webp\" alt=\"Plaky board\" class=\"wp-image-17922\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool.webp 1800w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool-512x300.webp 512w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool-1110x650.webp 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool-768x450.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool-1536x899.webp 1536w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plaky-by-CAKE.com-is-the-prime-example-of-a-robust-yet-simple-PM-tool-18x12.webp 18w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" \/><figcaption class=\"wp-element-caption\">Plaky by CAKE.com is the prime example of a robust yet simple PM tool<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"4-manage-project-knowledge\" class=\"wp-block-heading\">#4 Manage project knowledge<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The process of managing project knowledge focuses on <strong>identifying, capturing, and using knowledge<\/strong> throughout the project to support better outcomes and avoid repeating mistakes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are 2 kinds of valuable information:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Explicit knowledge <\/strong>\u2014 written down, documented, and easy to share (e.g., documents, reports, data)<\/li>\n\n\n\n<li><strong>Tacit knowledge<\/strong> \u2014 gained through experience and harder to explain\/document (e.g., insights, lessons learned)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The knowledge management process works in 2 directions: it uses existing knowledge to improve current project decisions, and it creates new knowledge based on project experience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So, project teams must continuously document best practices and problem-solving approaches, making them accessible to others within the team or organization.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The benefits include higher efficiency, stronger <a href=\"https:\/\/plaky.com\/learn\/project-management\/risk-management-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">risk management<\/a>, and more informed decision-making in later stages of the project or in future projects.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1746\" height=\"1068\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky.webp\" alt=\"File sharing in Plaky\" class=\"wp-image-17924\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky.webp 1746w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky-490x300.webp 490w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky-1110x679.webp 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky-768x470.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky-1536x940.webp 1536w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Knowledge-management-is-easy-with-file-sharing-in-Plaky-18x12.webp 18w\" sizes=\"auto, (max-width: 1746px) 100vw, 1746px\" \/><figcaption class=\"wp-element-caption\">Knowledge management is easy with <a href=\"https:\/\/plaky.com\/features\/files\" type=\"link\" id=\"https:\/\/plaky.com\/features\/files\" target=\"_blank\" rel=\"noreferrer noopener\">file sharing in Plaky<\/a><\/figcaption><\/figure>\n<\/div>\n\n\n<h3 id=\"5-monitor-and-control-project-work\" class=\"wp-block-heading\">#5 Monitor and control project work<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s necessary to perform <a href=\"https:\/\/plaky.com\/blog\/project-evaluation\/\" target=\"_blank\" rel=\"noreferrer noopener\">project evaluation<\/a>, i.e., track project work and compare it against the project plan to <strong>make sure the project is progressing as intended<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here\u2019s how project monitoring typically happens:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Tracking against baselines<\/strong> \u2014 compare actual progress to the approved baselines to identify variances.<\/li>\n\n\n\n<li><strong>Performance reporting<\/strong> \u2014 use status reports, dashboards, and <a href=\"https:\/\/plaky.com\/blog\/kpi-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">KPIs<\/a> to summarize project health.<\/li>\n\n\n\n<li><strong>Regular status meetings <\/strong>\u2014 hold team check-ins, Sprint reviews, or stakeholder updates to review progress together.<\/li>\n\n\n\n<li><strong>Change requests <\/strong>\u2014 log and evaluate any proposed changes that could affect project constraints before they are approved\/rejected.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If the project starts to drift, corrective or preventative actions are necessary to bring it on track. Plus, you can use the insights to forecast future performance and anticipate risks before they become critical problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Again, using a PM app is very handy here, as features like task boards, different project views, and automations can simplify and clarify the progress tracking process.<\/p>\n\n\n\n<p class=\"custom-btn wp-block-paragraph\"><a href=\"https:\/\/plaky.com\/kanban-tool\" target=\"_blank\" rel=\"noreferrer noopener\">Get a free Kanban app \u2014 Plaky<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1110\" height=\"676\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-1110x676.webp\" alt=\"Plaky's Kanban view\" class=\"wp-image-17925\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-1110x676.webp 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-492x300.webp 492w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-768x468.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-1536x936.webp 1536w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages-18x12.webp 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Plakys-Kanban-view-is-ideal-for-tracking-progress-through-stages.webp 1800w\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" \/><figcaption class=\"wp-element-caption\">Plaky\u2019s Kanban view is ideal for tracking progress through stages<\/figcaption><\/figure>\n\n\n\n<h3 id=\"6-perform-integrated-change-control\" class=\"wp-block-heading\">#6 Perform integrated change control<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The process of performing integrated change control focuses on<strong> reviewing all proposed changes<\/strong> so that they can be approved, rejected, or deferred.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A single change can affect multiple project areas, so you can\u2019t evaluate it in isolation. In practice, no change comes for free, and typical trade-offs include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Time vs. scope <\/strong>\u2014 adding scope usually extends the timeline (unless extra resources are added).<\/li>\n\n\n\n<li><strong>Cost vs. time<\/strong> \u2014 faster delivery often requires more budget (e.g., overtime, extra staff, outsourcing).<\/li>\n\n\n\n<li><strong>Quality vs. cost\/time<\/strong> \u2014 higher quality standards may require more testing, revisions, or specialized expertise.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All changes must be informed decisions, not assumptions. So, project managers typically assess impact reports, consult stakeholders, and consider <a href=\"https:\/\/plaky.com\/learn\/project-management\/dependencies-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">dependencies<\/a> before approving any project change.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1063\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky.webp\" alt=\"Custom approval statuses in Plaky\" class=\"wp-image-17927\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky.webp 1600w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky-452x300.webp 452w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky-1110x737.webp 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky-768x510.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky-1536x1020.webp 1536w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Creating-custom-approval-statuses-in-Plaky-18x12.webp 18w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><figcaption class=\"wp-element-caption\">Creating custom approval statuses in Plaky<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Naturally, approved changes must be reflected in updated project documents (including the project management plan and baselines). It\u2019s crucial that the entire <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-roles\/\" target=\"_blank\" rel=\"noreferrer noopener\">project team<\/a> works from the same current versions.<\/p>\n\n\n\n<h3 id=\"7-close-the-project-or-phase\" class=\"wp-block-heading\">#7 Close the project or phase<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The final step in project integration management is the <strong>official transition from execution to closure or from one phase to the next.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A key part of project closure is confirming that all contractual and project requirements have been met, which includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Obtaining formal acceptance from stakeholders or clients<\/li>\n\n\n\n<li>Finalizing documentation<\/li>\n\n\n\n<li>Closing contracts<\/li>\n\n\n\n<li>Releasing project resources<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A project closure meeting is also common, though not strictly mandatory in every case. In practice, many organizations separate the closure into 2 parts:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>A formal sign-off meeting<\/strong> \u2014 focusing on acceptance and contractual closure<\/li>\n\n\n\n<li><strong>A retrospective or lessons learned session<\/strong> \u2014 focusing on reflection and improvement<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Regardless of whether you hold a closure meeting or not, the project team should reflect on both what went well and what could have been better, making those <a href=\"https:\/\/plaky.com\/blog\/lessons-learned-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">lessons learned<\/a> valuable for future teams and projects.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"1024\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process-803x1024.webp\" alt=\"A 5-step lessons learned process\" class=\"wp-image-17929\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process-803x1024.webp 803w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process-235x300.webp 235w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process-768x979.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process-9x12.webp 9w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/A-5-step-lessons-learned-process.webp 1200w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n<\/div>\n\n\n<h2 id=\"why-is-project-integration-management-important\" class=\"wp-block-heading\">Why is project integration management important?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Here are some of the biggest benefits of project integration management:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Better cross-functional alignment<\/strong> \u2014 helping different teams and departments work toward the same objectives instead of <a href=\"https:\/\/plaky.com\/blog\/dangers-of-working-in-silos\/\" target=\"_blank\" rel=\"noreferrer noopener\">operating in silos<\/a> (isolated systems)<\/li>\n\n\n\n<li><strong>Improved decision-making<\/strong> \u2014 giving project managers a complete view of how risks or changes affect the entire project<\/li>\n\n\n\n<li><strong>Stronger control and visibility<\/strong> \u2014 making it easier to track progress, detect issues early, and prevent conflicting priorities<\/li>\n\n\n\n<li><strong>Effective change management <\/strong>\u2014 ensuring changes are evaluated holistically before implementation to reduce unexpected impacts<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">To sum up, project integration management increases the likelihood of delivering projects on time, within budget, and according to stakeholder expectations.<\/p>\n\n\n\n<h2 id=\"tools-and-techniques-in-project-integration-management\" class=\"wp-block-heading\">Tools and techniques in project integration management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">You need a combination of tools, techniques, and frameworks to coordinate work across multiple project areas \u2014 let\u2019s look at some common examples.<\/p>\n\n\n\n<h3 id=\"pm-software\" class=\"wp-block-heading\">PM software<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">According to <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-statistics\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management statistics<\/a>, high-performing project management offices (PMOs) tend to be more digitally organized and tool-driven. That\u2019s likely because it\u2019s easier to stay organized with a platform that offers features such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Customizable fields<\/li>\n\n\n\n<li>Templates<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/blog\/gantt-chart-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt charts<\/a><\/li>\n\n\n\n<li>Automations<\/li>\n\n\n\n<li>Real-time notifications<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Centralized <a href=\"https:\/\/plaky.com\/blog\/what-is-task-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">task management<\/a> and clear accountability ultimately lead to better productivity and higher chances of project success.<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>\ud83d\udca1 Plaky Pro Tip<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Interested in seeing our top 10 PM software recommendations? Check out this listicle:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/blog\/best-project-management-apps\/\" target=\"_blank\" rel=\"noreferrer noopener\">10 Best Project Management Apps to Save Time &amp; Work Smarter<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h3 id=\"pm-methodologies\" class=\"wp-block-heading\">PM methodologies<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There are various <a href=\"https:\/\/plaky.com\/learn\/project-management\/project-management-methodologies\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management methodologies<\/a>, i.e., structured approaches for organizing and managing work with more precision and predictability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here are some of the most commonly used methodologies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/waterfall-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Waterfall<\/strong><\/a><strong> <\/strong>\u2014 a linear method where work is completed in sequential phrases, with each stage finishing before the next one begins<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/agile-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Agile<\/strong><\/a> \u2014 an iterative approach that promotes flexibility, collaboration, and continuous improvement<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrum-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Scrum<\/strong><\/a> \u2014 a popular Agile framework that organizes work into short development cycles called Sprints<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/kanban-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Kanban<\/strong><\/a> \u2014 a visual workflow management system for tracking work progress through stages<\/li>\n\n\n\n<li><a href=\"https:\/\/plaky.com\/learn\/project-management\/scrumban-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Scrumban<\/strong><\/a> \u2014 a hybrid approach that combines Scrum\u2019s Sprint structure with Kanban\u2019s flexible workflow visualization<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The right methodology depends on factors such as project complexity, team structure, how frequently requirements are expected to change etc., so make sure to do your research and choose based on your specific needs.<\/p>\n\n\n\n<h3 id=\"work-breakdown-structure\" class=\"wp-block-heading\">Work breakdown structure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A <a href=\"https:\/\/plaky.com\/learn\/project-management\/work-breakdown-structure-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">work breakdown structure (WBS)<\/a> is a planning technique that segments a project into smaller, manageable components.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To create a WBS, you need to:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Define the project scope and objectives.<\/li>\n\n\n\n<li>Identify major project phases or deliverables.<\/li>\n\n\n\n<li>Decompose the deliverables into smaller tasks.<\/li>\n\n\n\n<li>Assign responsibility and estimate effort.<\/li>\n\n\n\n<li>Review and validate the WBS.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, the WBS helps project managers spot dependencies and plan resources more accurately.<\/p>\n\n\n\n<h3 id=\"critical-path-method\" class=\"wp-block-heading\">Critical path method<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/plaky.com\/learn\/project-management\/critical-path-method\/\" target=\"_blank\" rel=\"noreferrer noopener\">critical path method (CPM)<\/a> is a scheduling technique for determining the longest sequence of dependent project tasks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The CPM also defines the shortest possible time in which the project can be completed. Any delay in a task on the critical path directly affects the overall project deadline, making it the most important sequence to monitor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So, the CPM helps you understand which activities are essential for keeping the project on schedule and which have flexibility.<\/p>\n\n\n\n<p class=\"custom-btn wp-block-paragraph\"><a href=\"https:\/\/docs.google.com\/spreadsheets\/d\/17u-CWEYbEFVJT3qInNauX8vHINO_Rg1Jm67ZbqJGcO0\/copy?gid=0#gid=0\" target=\"_blank\" rel=\"noreferrer noopener\">Use our free CPM template<\/a><\/p>\n\n\n\n<h3 id=\"critical-chain-project-management\" class=\"wp-block-heading\">Critical chain project management<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To focus on both task dependencies and resource availability, you can use a scheduling technique known as <a href=\"https:\/\/plaky.com\/learn\/project-management\/critical-chain-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">critical chain project management (CCPM)<\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A key feature of CCPM is the use of buffers \u2014 extra time built into a project schedule to protect it against delays. However, instead of adding buffers to individual tasks, CCPM puts them in one shared safety zone for the entire project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By placing equal emphasis on task order and the necessary resources (people, tools, or equipment), CCPM leads to more realistic schedules and fewer bottlenecks.<\/p>\n\n\n\n<h2 id=\"how-plaky-by-cake-com-supports-project-integration-management\" class=\"wp-block-heading\">How Plaky by CAKE.com supports project integration management&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As you could see throughout this article, a reliable PM solution is a must for effective project integration management.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Consider <a href=\"https:\/\/plaky.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Plaky<\/strong><\/a> \u2014 with <strong>unlimited projects, tasks, and users,<\/strong> our platform lets you scale without worrying about tool limitations or fragmented workspaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plaky also offers benefits such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Flexible work organization<\/strong> \u2014 <a href=\"https:\/\/plaky.com\/learn\/plaky\/organization-and-hierarchy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plaky\u2019s hierarchy<\/a> is neat and logical, organizing work into Spaces, Boards, and (Sub)Items. For extra convenience, you can move Items between groups within a project or even move them to another Board. Also, you can convert a Subitem into an Item if its complexity grows, requiring better visibility.<\/li>\n\n\n\n<li><strong>High level of customization<\/strong> \u2014 <a href=\"https:\/\/plaky.com\/features\/fields\" target=\"_blank\" rel=\"noreferrer noopener\">Fields<\/a> (Text, Numbers, Link, Date, etc.) and <a href=\"https:\/\/plaky.com\/features\/board-views\" target=\"_blank\" rel=\"noreferrer noopener\">multiple project views<\/a> (Table, Gantt, Kanban, and Chart) allow you to build whatever project boards your team needs. Plus, Plaky\u2019s custom color picker ensures all tags and labels are the exact shade you want.<\/li>\n\n\n\n<li><strong>Smooth collaboration <\/strong>\u2014 Plaky enables clear communication via threaded comments, @mentions, and emoji reactions. Centralized collaboration keeps all project discussions and decisions in one place, with the <a href=\"https:\/\/plaky.com\/features\/activity-log\" target=\"_blank\" rel=\"noreferrer noopener\">Activity log<\/a> preserving all updates.<\/li>\n\n\n\n<li><strong>Standardized processes<\/strong> \u2014 <a href=\"https:\/\/plaky.com\/features\/automations\" target=\"_blank\" rel=\"noreferrer noopener\">Board automations<\/a> help you handle repetitive tasks with ease and ensure routine processes are performed consistently. In addition, <a href=\"https:\/\/plaky.com\/features\/templates\" target=\"_blank\" rel=\"noreferrer noopener\">Plaky\u2019s templates<\/a> allow every project to start with the same structure for consistency.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1110\" height=\"580\" src=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-1110x580.webp\" alt=\"Comments in Plaky\" class=\"wp-image-17931\" srcset=\"https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-1110x580.webp 1110w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-574x300.webp 574w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-285x150.webp 285w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-768x401.webp 768w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-1536x802.webp 1536w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context-18x9.webp 18w, https:\/\/plaky.com\/blog\/wp-content\/uploads\/2022\/10\/Comments-in-Plaky-preserve-critical-context.webp 1800w\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" \/><figcaption class=\"wp-element-caption\">Comments in Plaky preserve critical context<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Moreover, Plaky has <a href=\"https:\/\/plaky.com\/apps\" target=\"_blank\" rel=\"noreferrer noopener\">native mobile apps<\/a> (Android and iOS), letting you stay connected to updates even when away from your desk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a cherry on top, <a href=\"https:\/\/plaky.com\/pricing\" target=\"_blank\" rel=\"noreferrer noopener\">Plaky\u2019s pricing<\/a> ranges from a functional free plan to an affordable enterprise-grade tier, depending on your needs and budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Keep every part of your project connected from start to finish \u2014 with Plaky by CAKE.com.<\/em><\/p>\n\n\n\n<p class=\"custom-btn wp-block-paragraph\"><a href=\"https:\/\/plaky.com\/help\/contact\/sales\/\" target=\"_blank\" rel=\"noreferrer noopener\">Book a demo<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Learn what project integration management is, how its 7 PMBOK processes work, and which tools help you keep every part of your project aligned.<\/p>\n","protected":false},"author":8,"featured_media":17920,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1125","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"acf":[],"_links":{"self":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/1125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/comments?post=1125"}],"version-history":[{"count":34,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/1125\/revisions"}],"predecessor-version":[{"id":18000,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/posts\/1125\/revisions\/18000"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media\/17920"}],"wp:attachment":[{"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/media?parent=1125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/categories?post=1125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plaky.com\/blog\/wp-json\/wp\/v2\/tags?post=1125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}